Routing info

Name: Auto 2025-12-07

Routing metric: Travel time

1005 Trucks in Route

Restrictions

No Restrictions Applied.

Truck Station

Station Name: TS 1

Address: Filonos 2-8, Keratsini 187 57

Path info

Path ID: 195446

Truck: Truck auto 78 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 77 - Driver
  • Worker 152 - Worker
  • Worker 153 - Worker

Load: 15.04 m³

Duration: 00:16:15

Travel Duration: 00:07:15

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:18

Slack: 22:13:41

Path info

Path ID: 195447

Truck: Truck auto 88 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 87 - Driver
  • Worker 172 - Worker
  • Worker 173 - Worker

Load: 14.98 m³

Duration: 00:12:12

Travel Duration: 00:03:12

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:15

Slack: 22:17:44

Path info

Path ID: 195448

Truck: Truck auto 92 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 91 - Driver
  • Worker 180 - Worker
  • Worker 181 - Worker

Load: 15.21 m³

Duration: 00:13:09

Travel Duration: 00:05:09

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:12

Slack: 22:16:47

Path info

Path ID: 195449

Truck: Truck auto 96 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 95 - Driver
  • Worker 188 - Worker
  • Worker 189 - Worker

Load: 13.51 m³

Duration: 00:13:28

Travel Duration: 00:05:28

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:31

Slack: 22:16:28

Path info

Path ID: 195450

Truck: Truck auto 146 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 145 - Driver
  • Worker 288 - Worker
  • Worker 289 - Worker

Load: 14.85 m³

Duration: 00:11:51

Travel Duration: 00:03:51

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:41:54

Slack: 22:18:05

Path info

Path ID: 195451

Truck: Truck auto 232 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 231 - Driver
  • Worker 460 - Worker
  • Worker 461 - Worker

Load: 15.15 m³

Duration: 00:13:19

Travel Duration: 00:04:19

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:22

Slack: 22:16:37

Path info

Path ID: 195452

Truck: Truck auto 238 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 237 - Driver
  • Worker 472 - Worker
  • Worker 473 - Worker

Load: 15.56 m³

Duration: 00:14:54

Travel Duration: 00:03:54

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:57

Slack: 22:15:02

Path info

Path ID: 195453

Truck: Truck auto 244 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 243 - Driver
  • Worker 484 - Worker
  • Worker 485 - Worker

Load: 15.91 m³

Duration: 00:13:17

Travel Duration: 00:03:17

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:20

Slack: 22:16:39

Path info

Path ID: 195454

Truck: Truck auto 394 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 393 - Driver
  • Worker 784 - Worker
  • Worker 785 - Worker

Load: 15.32 m³

Duration: 00:13:24

Travel Duration: 00:04:24

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:27

Slack: 22:16:32

Path info

Path ID: 195455

Truck: Truck auto 412 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 411 - Driver
  • Worker 820 - Worker
  • Worker 821 - Worker

Load: 15.61 m³

Duration: 00:17:40

Travel Duration: 00:06:40

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:43

Slack: 22:12:16

Path info

Path ID: 195456

Truck: Truck auto 484 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 483 - Driver
  • Worker 964 - Worker
  • Worker 965 - Worker

Load: 15.03 m³

Duration: 00:14:58

Travel Duration: 00:03:58

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:01

Slack: 22:14:58

Path info

Path ID: 195457

Truck: Truck auto 486 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 485 - Driver
  • Worker 968 - Worker
  • Worker 969 - Worker

Load: 15.96 m³

Duration: 00:16:06

Travel Duration: 00:05:06

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:09

Slack: 22:13:50

Path info

Path ID: 195458

Truck: Truck auto 494 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 493 - Driver
  • Worker 984 - Worker
  • Worker 985 - Worker

Load: 14.75 m³

Duration: 00:14:15

Travel Duration: 00:04:15

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:18

Slack: 22:15:41

Path info

Path ID: 195459

Truck: Truck auto 514 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 513 - Driver
  • Worker 1024 - Worker
  • Worker 1025 - Worker

Load: 15.9 m³

Duration: 00:13:31

Travel Duration: 00:03:31

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:34

Slack: 22:16:25

Path info

Path ID: 195460

Truck: Truck auto 538 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 537 - Driver
  • Worker 1072 - Worker
  • Worker 1073 - Worker

Load: 14.93 m³

Duration: 00:16:15

Travel Duration: 00:06:15

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:18

Slack: 22:13:41

Path info

Path ID: 195461

Truck: Truck auto 712 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 711 - Driver
  • Worker 1420 - Worker
  • Worker 1421 - Worker

Load: 16.0 m³

Duration: 00:15:18

Travel Duration: 00:06:18

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:21

Slack: 22:14:38

Path info

Path ID: 195462

Truck: Truck auto 788 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 787 - Driver
  • Worker 1572 - Worker
  • Worker 1573 - Worker

Load: 13.31 m³

Duration: 00:13:43

Travel Duration: 00:04:43

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:46

Slack: 22:16:13

Path info

Path ID: 195463

Truck: Truck auto 792 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 791 - Driver
  • Worker 1580 - Worker
  • Worker 1581 - Worker

Load: 15.41 m³

Duration: 00:16:02

Travel Duration: 00:05:02

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:05

Slack: 22:13:54

Path info

Path ID: 195464

Truck: Truck auto 836 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 835 - Driver
  • Worker 1668 - Worker
  • Worker 1669 - Worker

Load: 15.45 m³

Duration: 00:17:16

Travel Duration: 00:07:16

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:19

Slack: 22:12:40

Path info

Path ID: 195465

Truck: Truck auto 928 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 927 - Driver
  • Worker 1852 - Worker
  • Worker 1853 - Worker

Load: 15.62 m³

Duration: 00:16:58

Travel Duration: 00:06:58

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:01

Slack: 22:12:58

Path info

Path ID: 195466

Truck: Truck auto 1 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • person10 - Driver
  • person12 - Worker
  • person13 - Worker

Load: 15.44 m³

Duration: 00:13:16

Travel Duration: 00:04:16

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:19

Slack: 22:16:40

Path info

Path ID: 195467

Truck: Truck auto 17 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 16 - Driver
  • Worker 30 - Worker
  • Worker 31 - Worker

Load: 15.9 m³

Duration: 00:16:26

Travel Duration: 00:06:26

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:29

Slack: 22:13:30

Path info

Path ID: 195468

Truck: Truck auto 109 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 108 - Driver
  • Worker 214 - Worker
  • Worker 215 - Worker

Load: 15.94 m³

Duration: 00:12:58

Travel Duration: 00:03:58

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:01

Slack: 22:16:58

Path info

Path ID: 195469

Truck: Truck auto 127 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 126 - Driver
  • Worker 250 - Worker
  • Worker 251 - Worker

Load: 15.6 m³

Duration: 00:17:51

Travel Duration: 00:06:51

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:54

Slack: 22:12:05

Path info

Path ID: 195470

Truck: Truck auto 149 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 148 - Driver
  • Worker 294 - Worker
  • Worker 295 - Worker

Load: 15.21 m³

Duration: 00:17:49

Travel Duration: 00:05:49

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:52

Slack: 22:12:07

Path info

Path ID: 195471

Truck: Truck auto 197 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 196 - Driver
  • Worker 390 - Worker
  • Worker 391 - Worker

Load: 15.61 m³

Duration: 00:16:39

Travel Duration: 00:05:39

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:42

Slack: 22:13:17

Path info

Path ID: 195472

Truck: Truck auto 211 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 210 - Driver
  • Worker 418 - Worker
  • Worker 419 - Worker

Load: 15.97 m³

Duration: 00:14:57

Travel Duration: 00:05:57

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:00

Slack: 22:14:59

Path info

Path ID: 195473

Truck: Truck auto 233 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 232 - Driver
  • Worker 462 - Worker
  • Worker 463 - Worker

Load: 14.61 m³

Duration: 00:12:53

Travel Duration: 00:03:53

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:56

Slack: 22:17:03

Path info

Path ID: 195474

Truck: Truck auto 247 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 246 - Driver
  • Worker 490 - Worker
  • Worker 491 - Worker

Load: 14.87 m³

Duration: 00:14:34

Travel Duration: 00:04:34

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:37

Slack: 22:15:22

Path info

Path ID: 195475

Truck: Truck auto 281 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 280 - Driver
  • Worker 558 - Worker
  • Worker 559 - Worker

Load: 15.85 m³

Duration: 00:16:33

Travel Duration: 00:06:33

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:36

Slack: 22:13:23

Path info

Path ID: 195476

Truck: Truck auto 289 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 288 - Driver
  • Worker 574 - Worker
  • Worker 575 - Worker

Load: 14.37 m³

Duration: 00:13:38

Travel Duration: 00:03:38

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:41

Slack: 22:16:18

Path info

Path ID: 195477

Truck: Truck auto 307 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 306 - Driver
  • Worker 610 - Worker
  • Worker 611 - Worker

Load: 11.35 m³

Duration: 00:09:44

Travel Duration: 00:02:44

Wait Duration: 00:00:00

Service Duration: 00:07:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:39:47

Slack: 22:20:12

Path info

Path ID: 195478

Truck: Truck auto 313 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 312 - Driver
  • Worker 622 - Worker
  • Worker 623 - Worker

Load: 14.18 m³

Duration: 00:18:35

Travel Duration: 00:08:35

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:38

Slack: 22:11:21

Path info

Path ID: 195479

Truck: Truck auto 325 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 324 - Driver
  • Worker 646 - Worker
  • Worker 647 - Worker

Load: 15.14 m³

Duration: 00:15:39

Travel Duration: 00:05:39

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:42

Slack: 22:14:17

Path info

Path ID: 195480

Truck: Truck auto 403 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 402 - Driver
  • Worker 802 - Worker
  • Worker 803 - Worker

Load: 15.2 m³

Duration: 00:17:00

Travel Duration: 00:06:00

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:03

Slack: 22:12:56

Path info

Path ID: 195481

Truck: Truck auto 423 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 422 - Driver
  • Worker 842 - Worker
  • Worker 843 - Worker

Load: 15.88 m³

Duration: 00:16:21

Travel Duration: 00:05:21

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:24

Slack: 22:13:35

Path info

Path ID: 195482

Truck: Truck auto 463 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 462 - Driver
  • Worker 922 - Worker
  • Worker 923 - Worker

Load: 15.79 m³

Duration: 00:14:03

Travel Duration: 00:04:03

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:06

Slack: 22:15:53

Path info

Path ID: 195483

Truck: Truck auto 533 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 532 - Driver
  • Worker 1062 - Worker
  • Worker 1063 - Worker

Load: 15.81 m³

Duration: 00:12:49

Travel Duration: 00:03:49

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:52

Slack: 22:17:07

Path info

Path ID: 195484

Truck: Truck auto 535 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 534 - Driver
  • Worker 1066 - Worker
  • Worker 1067 - Worker

Load: 15.45 m³

Duration: 00:14:54

Travel Duration: 00:05:54

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:57

Slack: 22:15:02

Path info

Path ID: 195485

Truck: Truck auto 567 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 566 - Driver
  • Worker 1130 - Worker
  • Worker 1131 - Worker

Load: 15.52 m³

Duration: 00:15:13

Travel Duration: 00:05:13

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:16

Slack: 22:14:43

Path info

Path ID: 195486

Truck: Truck auto 571 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 570 - Driver
  • Worker 1138 - Worker
  • Worker 1139 - Worker

Load: 15.5 m³

Duration: 00:16:49

Travel Duration: 00:06:49

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:52

Slack: 22:13:07

Path info

Path ID: 195487

Truck: Truck auto 649 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 648 - Driver
  • Worker 1294 - Worker
  • Worker 1295 - Worker

Load: 15.8 m³

Duration: 00:12:29

Travel Duration: 00:03:29

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:32

Slack: 22:17:27

Path info

Path ID: 195488

Truck: Truck auto 657 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 656 - Driver
  • Worker 1310 - Worker
  • Worker 1311 - Worker

Load: 15.3 m³

Duration: 00:11:53

Travel Duration: 00:02:53

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:41:56

Slack: 22:18:03

Path info

Path ID: 195489

Truck: Truck auto 719 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 718 - Driver
  • Worker 1434 - Worker
  • Worker 1435 - Worker

Load: 16.0 m³

Duration: 00:15:21

Travel Duration: 00:06:21

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:24

Slack: 22:14:35

Path info

Path ID: 195490

Truck: Truck auto 733 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 732 - Driver
  • Worker 1462 - Worker
  • Worker 1463 - Worker

Load: 15.13 m³

Duration: 00:13:07

Travel Duration: 00:03:07

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:10

Slack: 22:16:49

Path info

Path ID: 195491

Truck: Truck auto 739 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 738 - Driver
  • Worker 1474 - Worker
  • Worker 1475 - Worker

Load: 15.95 m³

Duration: 00:14:51

Travel Duration: 00:04:51

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:54

Slack: 22:15:05

Path info

Path ID: 195492

Truck: Truck auto 755 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 754 - Driver
  • Worker 1506 - Worker
  • Worker 1507 - Worker

Load: 15.98 m³

Duration: 00:14:13

Travel Duration: 00:04:13

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:16

Slack: 22:15:43

Path info

Path ID: 195493

Truck: Truck auto 793 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 792 - Driver
  • Worker 1582 - Worker
  • Worker 1583 - Worker

Load: 15.95 m³

Duration: 00:14:14

Travel Duration: 00:04:14

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:17

Slack: 22:15:42

Path info

Path ID: 195494

Truck: Truck auto 871 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 870 - Driver
  • Worker 1738 - Worker
  • Worker 1739 - Worker

Load: 15.55 m³

Duration: 00:18:09

Travel Duration: 00:07:09

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:12

Slack: 22:11:47

Path info

Path ID: 195495

Truck: Truck auto 929 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 928 - Driver
  • Worker 1854 - Worker
  • Worker 1855 - Worker

Load: 15.8 m³

Duration: 00:13:07

Travel Duration: 00:03:07

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:10

Slack: 22:16:49

Path info

Path ID: 195496

Truck: Truck auto 5 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 4 - Driver
  • Worker 6 - Worker
  • Worker 7 - Worker

Load: 15.6 m³

Duration: 00:17:05

Travel Duration: 00:07:05

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:08

Slack: 22:12:51

Path info

Path ID: 195497

Truck: Truck auto 23 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 22 - Driver
  • Worker 42 - Worker
  • Worker 43 - Worker

Load: 15.82 m³

Duration: 00:15:45

Travel Duration: 00:05:45

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:48

Slack: 22:14:11

Path info

Path ID: 195498

Truck: Truck auto 41 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 40 - Driver
  • Worker 78 - Worker
  • Worker 79 - Worker

Load: 15.95 m³

Duration: 00:12:00

Travel Duration: 00:03:00

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:03

Slack: 22:17:56

Path info

Path ID: 195499

Truck: Truck auto 67 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 66 - Driver
  • Worker 130 - Worker
  • Worker 131 - Worker

Load: 15.2 m³

Duration: 00:12:52

Travel Duration: 00:04:52

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:55

Slack: 22:17:04

Path info

Path ID: 195500

Truck: Truck auto 133 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 132 - Driver
  • Worker 262 - Worker
  • Worker 263 - Worker

Load: 14.66 m³

Duration: 00:14:29

Travel Duration: 00:05:29

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:32

Slack: 22:15:27

Path info

Path ID: 195501

Truck: Truck auto 151 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 150 - Driver
  • Worker 298 - Worker
  • Worker 299 - Worker

Load: 15.69 m³

Duration: 00:12:52

Travel Duration: 00:03:52

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:55

Slack: 22:17:04

Path info

Path ID: 195502

Truck: Truck auto 155 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 154 - Driver
  • Worker 306 - Worker
  • Worker 307 - Worker

Load: 14.42 m³

Duration: 00:15:03

Travel Duration: 00:06:03

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:06

Slack: 22:14:53

Path info

Path ID: 195503

Truck: Truck auto 161 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 160 - Driver
  • Worker 318 - Worker
  • Worker 319 - Worker

Load: 13.23 m³

Duration: 00:14:26

Travel Duration: 00:04:26

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:29

Slack: 22:15:30

Path info

Path ID: 195504

Truck: Truck auto 249 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 248 - Driver
  • Worker 494 - Worker
  • Worker 495 - Worker

Load: 15.67 m³

Duration: 00:14:51

Travel Duration: 00:04:51

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:54

Slack: 22:15:05

Path info

Path ID: 195505

Truck: Truck auto 281 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 280 - Driver
  • Worker 558 - Worker
  • Worker 559 - Worker

Load: 13.01 m³

Duration: 00:10:08

Travel Duration: 00:03:08

Wait Duration: 00:00:00

Service Duration: 00:07:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:40:11

Slack: 22:19:48

Path info

Path ID: 195506

Truck: Truck auto 333 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 332 - Driver
  • Worker 662 - Worker
  • Worker 663 - Worker

Load: 15.15 m³

Duration: 00:14:41

Travel Duration: 00:03:41

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:44

Slack: 22:15:15

Path info

Path ID: 195507

Truck: Truck auto 337 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 336 - Driver
  • Worker 670 - Worker
  • Worker 671 - Worker

Load: 14.74 m³

Duration: 00:11:32

Travel Duration: 00:03:32

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:41:35

Slack: 22:18:24

Path info

Path ID: 195508

Truck: Truck auto 387 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 386 - Driver
  • Worker 770 - Worker
  • Worker 771 - Worker

Load: 15.34 m³

Duration: 00:15:25

Travel Duration: 00:06:25

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:28

Slack: 22:14:31

Path info

Path ID: 195509

Truck: Truck auto 395 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 394 - Driver
  • Worker 786 - Worker
  • Worker 787 - Worker

Load: 15.92 m³

Duration: 00:15:34

Travel Duration: 00:05:34

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:37

Slack: 22:14:22

Path info

Path ID: 195510

Truck: Truck auto 553 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 552 - Driver
  • Worker 1102 - Worker
  • Worker 1103 - Worker

Load: 15.82 m³

Duration: 00:14:29

Travel Duration: 00:05:29

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:32

Slack: 22:15:27

Path info

Path ID: 195511

Truck: Truck auto 595 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 594 - Driver
  • Worker 1186 - Worker
  • Worker 1187 - Worker

Load: 14.32 m³

Duration: 00:12:34

Travel Duration: 00:03:34

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:37

Slack: 22:17:22

Path info

Path ID: 195512

Truck: Truck auto 733 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 732 - Driver
  • Worker 1462 - Worker
  • Worker 1463 - Worker

Load: 15.95 m³

Duration: 00:15:37

Travel Duration: 00:04:37

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:40

Slack: 22:14:19

Path info

Path ID: 195513

Truck: Truck auto 793 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 792 - Driver
  • Worker 1582 - Worker
  • Worker 1583 - Worker

Load: 15.83 m³

Duration: 00:15:49

Travel Duration: 00:06:49

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:52

Slack: 22:14:07

Path info

Path ID: 195514

Truck: Truck auto 801 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 800 - Driver
  • Worker 1598 - Worker
  • Worker 1599 - Worker

Load: 15.62 m³

Duration: 00:15:48

Travel Duration: 00:06:48

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:51

Slack: 22:14:08

Path info

Path ID: 195515

Truck: Truck auto 827 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 826 - Driver
  • Worker 1650 - Worker
  • Worker 1651 - Worker

Load: 15.77 m³

Duration: 00:14:22

Travel Duration: 00:04:22

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:25

Slack: 22:15:34

Path info

Path ID: 195516

Truck: Truck auto 905 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 904 - Driver
  • Worker 1806 - Worker
  • Worker 1807 - Worker

Load: 15.89 m³

Duration: 00:14:49

Travel Duration: 00:05:49

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:52

Slack: 22:15:07

Path info

Path ID: 195517

Truck: Truck auto 24 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 23 - Driver
  • Worker 44 - Worker
  • Worker 45 - Worker

Load: 15.95 m³

Duration: 00:15:04

Travel Duration: 00:06:04

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:07

Slack: 22:14:52

Path info

Path ID: 195518

Truck: Truck auto 78 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 77 - Driver
  • Worker 152 - Worker
  • Worker 153 - Worker

Load: 14.89 m³

Duration: 00:14:46

Travel Duration: 00:05:46

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:49

Slack: 22:15:10

Path info

Path ID: 195519

Truck: Truck auto 90 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 89 - Driver
  • Worker 176 - Worker
  • Worker 177 - Worker

Load: 15.95 m³

Duration: 00:16:36

Travel Duration: 00:06:36

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:39

Slack: 22:13:20

Path info

Path ID: 195520

Truck: Truck auto 126 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 125 - Driver
  • Worker 248 - Worker
  • Worker 249 - Worker

Load: 15.36 m³

Duration: 00:14:45

Travel Duration: 00:04:45

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:48

Slack: 22:15:11

Path info

Path ID: 195521

Truck: Truck auto 130 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 129 - Driver
  • Worker 256 - Worker
  • Worker 257 - Worker

Load: 15.68 m³

Duration: 00:17:00

Travel Duration: 00:07:00

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:03

Slack: 22:12:56

Path info

Path ID: 195522

Truck: Truck auto 204 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 203 - Driver
  • Worker 404 - Worker
  • Worker 405 - Worker

Load: 15.76 m³

Duration: 00:14:36

Travel Duration: 00:04:36

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:39

Slack: 22:15:20

Path info

Path ID: 195523

Truck: Truck auto 216 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 215 - Driver
  • Worker 428 - Worker
  • Worker 429 - Worker

Load: 15.79 m³

Duration: 00:13:28

Travel Duration: 00:04:28

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:31

Slack: 22:16:28

Path info

Path ID: 195524

Truck: Truck auto 226 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 225 - Driver
  • Worker 448 - Worker
  • Worker 449 - Worker

Load: 15.12 m³

Duration: 00:14:07

Travel Duration: 00:04:07

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:10

Slack: 22:15:49

Path info

Path ID: 195525

Truck: Truck auto 256 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 255 - Driver
  • Worker 508 - Worker
  • Worker 509 - Worker

Load: 15.68 m³

Duration: 00:17:59

Travel Duration: 00:05:59

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:02

Slack: 22:11:57

Path info

Path ID: 195526

Truck: Truck auto 294 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 293 - Driver
  • Worker 584 - Worker
  • Worker 585 - Worker

Load: 15.78 m³

Duration: 00:14:48

Travel Duration: 00:04:48

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:51

Slack: 22:15:08

Path info

Path ID: 195527

Truck: Truck auto 302 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 301 - Driver
  • Worker 600 - Worker
  • Worker 601 - Worker

Load: 15.84 m³

Duration: 00:17:06

Travel Duration: 00:06:06

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:09

Slack: 22:12:50

Path info

Path ID: 195528

Truck: Truck auto 376 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 375 - Driver
  • Worker 748 - Worker
  • Worker 749 - Worker

Load: 14.55 m³

Duration: 00:14:21

Travel Duration: 00:05:21

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:24

Slack: 22:15:35

Path info

Path ID: 195529

Truck: Truck auto 402 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 401 - Driver
  • Worker 800 - Worker
  • Worker 801 - Worker

Load: 13.89 m³

Duration: 00:13:44

Travel Duration: 00:04:44

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:47

Slack: 22:16:12

Path info

Path ID: 195530

Truck: Truck auto 458 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 457 - Driver
  • Worker 912 - Worker
  • Worker 913 - Worker

Load: 15.71 m³

Duration: 00:17:28

Travel Duration: 00:05:28

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:31

Slack: 22:12:28

Path info

Path ID: 195531

Truck: Truck auto 508 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 507 - Driver
  • Worker 1012 - Worker
  • Worker 1013 - Worker

Load: 15.12 m³

Duration: 00:15:06

Travel Duration: 00:06:06

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:09

Slack: 22:14:50

Path info

Path ID: 195532

Truck: Truck auto 570 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 569 - Driver
  • Worker 1136 - Worker
  • Worker 1137 - Worker

Load: 14.85 m³

Duration: 00:12:29

Travel Duration: 00:04:29

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:32

Slack: 22:17:27

Path info

Path ID: 195533

Truck: Truck auto 670 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 669 - Driver
  • Worker 1336 - Worker
  • Worker 1337 - Worker

Load: 15.94 m³

Duration: 00:17:13

Travel Duration: 00:06:13

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:16

Slack: 22:12:43

Path info

Path ID: 195534

Truck: Truck auto 686 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 685 - Driver
  • Worker 1368 - Worker
  • Worker 1369 - Worker

Load: 11.85 m³

Duration: 00:12:27

Travel Duration: 00:05:27

Wait Duration: 00:00:00

Service Duration: 00:07:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:30

Slack: 22:17:29

Path info

Path ID: 195535

Truck: Truck auto 844 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 843 - Driver
  • Worker 1684 - Worker
  • Worker 1685 - Worker

Load: 15.17 m³

Duration: 00:13:59

Travel Duration: 00:04:59

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:02

Slack: 22:15:57

Path info

Path ID: 195536

Truck: Truck auto 932 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 931 - Driver
  • Worker 1860 - Worker
  • Worker 1861 - Worker

Load: 14.97 m³

Duration: 00:15:22

Travel Duration: 00:06:22

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:25

Slack: 22:14:34

Path info

Path ID: 195537

Truck: Truck auto 26 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 25 - Driver
  • Worker 48 - Worker
  • Worker 49 - Worker

Load: 15.87 m³

Duration: 00:13:14

Travel Duration: 00:03:14

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:17

Slack: 22:16:42

Path info

Path ID: 195538

Truck: Truck auto 32 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 31 - Driver
  • Worker 60 - Worker
  • Worker 61 - Worker

Load: 14.34 m³

Duration: 00:12:31

Travel Duration: 00:04:31

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:34

Slack: 22:17:25

Path info

Path ID: 195539

Truck: Truck auto 40 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 39 - Driver
  • Worker 76 - Worker
  • Worker 77 - Worker

Load: 15.73 m³

Duration: 00:15:27

Travel Duration: 00:05:27

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:30

Slack: 22:14:29

Path info

Path ID: 195540

Truck: Truck auto 76 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 75 - Driver
  • Worker 148 - Worker
  • Worker 149 - Worker

Load: 15.81 m³

Duration: 00:13:59

Travel Duration: 00:03:59

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:02

Slack: 22:15:57

Path info

Path ID: 195541

Truck: Truck auto 80 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 79 - Driver
  • Worker 156 - Worker
  • Worker 157 - Worker

Load: 15.16 m³

Duration: 00:13:22

Travel Duration: 00:03:22

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:25

Slack: 22:16:34

Path info

Path ID: 195542

Truck: Truck auto 84 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 83 - Driver
  • Worker 164 - Worker
  • Worker 165 - Worker

Load: 15.66 m³

Duration: 00:13:48

Travel Duration: 00:04:48

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:51

Slack: 22:16:08

Path info

Path ID: 195543

Truck: Truck auto 88 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 87 - Driver
  • Worker 172 - Worker
  • Worker 173 - Worker

Load: 15.97 m³

Duration: 00:16:15

Travel Duration: 00:06:15

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:18

Slack: 22:13:41

Path info

Path ID: 195544

Truck: Truck auto 144 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 143 - Driver
  • Worker 284 - Worker
  • Worker 285 - Worker

Load: 15.91 m³

Duration: 00:15:08

Travel Duration: 00:04:08

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:11

Slack: 22:14:48

Path info

Path ID: 195545

Truck: Truck auto 148 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 147 - Driver
  • Worker 292 - Worker
  • Worker 293 - Worker

Load: 15.61 m³

Duration: 00:17:07

Travel Duration: 00:07:07

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:10

Slack: 22:12:49

Path info

Path ID: 195546

Truck: Truck auto 260 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 259 - Driver
  • Worker 516 - Worker
  • Worker 517 - Worker

Load: 15.97 m³

Duration: 00:14:56

Travel Duration: 00:04:56

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:59

Slack: 22:15:00

Path info

Path ID: 195547

Truck: Truck auto 292 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 291 - Driver
  • Worker 580 - Worker
  • Worker 581 - Worker

Load: 15.84 m³

Duration: 00:15:56

Travel Duration: 00:04:56

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:59

Slack: 22:14:00

Path info

Path ID: 195548

Truck: Truck auto 308 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 307 - Driver
  • Worker 612 - Worker
  • Worker 613 - Worker

Load: 15.89 m³

Duration: 00:15:03

Travel Duration: 00:05:03

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:06

Slack: 22:14:53

Path info

Path ID: 195549

Truck: Truck auto 340 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 339 - Driver
  • Worker 676 - Worker
  • Worker 677 - Worker

Load: 15.9 m³

Duration: 00:15:01

Travel Duration: 00:04:01

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:04

Slack: 22:14:55

Path info

Path ID: 195550

Truck: Truck auto 370 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 369 - Driver
  • Worker 736 - Worker
  • Worker 737 - Worker

Load: 15.5 m³

Duration: 00:15:07

Travel Duration: 00:05:07

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:10

Slack: 22:14:49

Path info

Path ID: 195551

Truck: Truck auto 376 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 375 - Driver
  • Worker 748 - Worker
  • Worker 749 - Worker

Load: 15.19 m³

Duration: 00:13:50

Travel Duration: 00:03:50

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:53

Slack: 22:16:06

Path info

Path ID: 195552

Truck: Truck auto 380 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 379 - Driver
  • Worker 756 - Worker
  • Worker 757 - Worker

Load: 16.0 m³

Duration: 00:16:47

Travel Duration: 00:05:47

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:50

Slack: 22:13:09

Path info

Path ID: 195553

Truck: Truck auto 414 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 413 - Driver
  • Worker 824 - Worker
  • Worker 825 - Worker

Load: 15.68 m³

Duration: 00:14:14

Travel Duration: 00:05:14

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:17

Slack: 22:15:42

Path info

Path ID: 195554

Truck: Truck auto 432 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 431 - Driver
  • Worker 860 - Worker
  • Worker 861 - Worker

Load: 15.93 m³

Duration: 00:14:53

Travel Duration: 00:04:53

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:56

Slack: 22:15:03

Path info

Path ID: 195555

Truck: Truck auto 438 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 437 - Driver
  • Worker 872 - Worker
  • Worker 873 - Worker

Load: 15.65 m³

Duration: 00:15:54

Travel Duration: 00:05:54

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:57

Slack: 22:14:02

Path info

Path ID: 195556

Truck: Truck auto 478 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 477 - Driver
  • Worker 952 - Worker
  • Worker 953 - Worker

Load: 15.35 m³

Duration: 00:12:40

Travel Duration: 00:04:40

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:43

Slack: 22:17:16

Path info

Path ID: 195557

Truck: Truck auto 488 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 487 - Driver
  • Worker 972 - Worker
  • Worker 973 - Worker

Load: 15.91 m³

Duration: 00:15:19

Travel Duration: 00:04:19

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:22

Slack: 22:14:37

Path info

Path ID: 195558

Truck: Truck auto 580 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 579 - Driver
  • Worker 1156 - Worker
  • Worker 1157 - Worker

Load: 15.98 m³

Duration: 00:16:16

Travel Duration: 00:06:16

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:19

Slack: 22:13:40

Path info

Path ID: 195559

Truck: Truck auto 650 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 649 - Driver
  • Worker 1296 - Worker
  • Worker 1297 - Worker

Load: 15.76 m³

Duration: 00:20:31

Travel Duration: 00:08:31

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:50:34

Slack: 22:09:25

Path info

Path ID: 195560

Truck: Truck auto 724 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 723 - Driver
  • Worker 1444 - Worker
  • Worker 1445 - Worker

Load: 15.4 m³

Duration: 00:13:45

Travel Duration: 00:03:45

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:48

Slack: 22:16:11

Path info

Path ID: 195561

Truck: Truck auto 740 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 739 - Driver
  • Worker 1476 - Worker
  • Worker 1477 - Worker

Load: 15.93 m³

Duration: 00:15:31

Travel Duration: 00:05:31

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:34

Slack: 22:14:25

Path info

Path ID: 195562

Truck: Truck auto 798 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 797 - Driver
  • Worker 1592 - Worker
  • Worker 1593 - Worker

Load: 15.96 m³

Duration: 00:15:16

Travel Duration: 00:06:16

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:19

Slack: 22:14:40

Path info

Path ID: 195563

Truck: Truck auto 834 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 833 - Driver
  • Worker 1664 - Worker
  • Worker 1665 - Worker

Load: 15.94 m³

Duration: 00:17:33

Travel Duration: 00:05:33

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:36

Slack: 22:12:23

Path info

Path ID: 195564

Truck: Truck auto 866 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 865 - Driver
  • Worker 1728 - Worker
  • Worker 1729 - Worker

Load: 15.93 m³

Duration: 00:17:31

Travel Duration: 00:06:31

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:34

Slack: 22:12:25

Path info

Path ID: 195565

Truck: Truck auto 986 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 985 - Driver
  • Worker 1968 - Worker
  • Worker 1969 - Worker

Load: 15.95 m³

Duration: 00:15:10

Travel Duration: 00:05:10

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:13

Slack: 22:14:46

Path info

Path ID: 195566

Truck: Truck auto 16 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 15 - Driver
  • Worker 28 - Worker
  • Worker 29 - Worker

Load: 16.0 m³

Duration: 00:13:42

Travel Duration: 00:03:42

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:45

Slack: 22:16:14

Path info

Path ID: 195567

Truck: Truck auto 26 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 25 - Driver
  • Worker 48 - Worker
  • Worker 49 - Worker

Load: 15.63 m³

Duration: 00:12:50

Travel Duration: 00:03:50

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:53

Slack: 22:17:06

Path info

Path ID: 195568

Truck: Truck auto 30 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 29 - Driver
  • Worker 56 - Worker
  • Worker 57 - Worker

Load: 15.92 m³

Duration: 00:12:11

Travel Duration: 00:03:11

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:14

Slack: 22:17:45

Path info

Path ID: 195569

Truck: Truck auto 34 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 33 - Driver
  • Worker 64 - Worker
  • Worker 65 - Worker

Load: 15.93 m³

Duration: 00:16:01

Travel Duration: 00:05:01

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:04

Slack: 22:13:55

Path info

Path ID: 195570

Truck: Truck auto 42 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 41 - Driver
  • Worker 80 - Worker
  • Worker 81 - Worker

Load: 15.04 m³

Duration: 00:12:07

Travel Duration: 00:03:07

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:10

Slack: 22:17:49

Path info

Path ID: 195571

Truck: Truck auto 52 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 51 - Driver
  • Worker 100 - Worker
  • Worker 101 - Worker

Load: 14.72 m³

Duration: 00:13:45

Travel Duration: 00:04:45

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:48

Slack: 22:16:11

Path info

Path ID: 195572

Truck: Truck auto 54 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 53 - Driver
  • Worker 104 - Worker
  • Worker 105 - Worker

Load: 15.92 m³

Duration: 00:13:56

Travel Duration: 00:03:56

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:59

Slack: 22:16:00

Path info

Path ID: 195573

Truck: Truck auto 94 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 93 - Driver
  • Worker 184 - Worker
  • Worker 185 - Worker

Load: 14.62 m³

Duration: 00:12:47

Travel Duration: 00:03:47

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:50

Slack: 22:17:09

Path info

Path ID: 195574

Truck: Truck auto 110 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 109 - Driver
  • Worker 216 - Worker
  • Worker 217 - Worker

Load: 15.57 m³

Duration: 00:13:38

Travel Duration: 00:03:38

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:41

Slack: 22:16:18

Path info

Path ID: 195575

Truck: Truck auto 198 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 197 - Driver
  • Worker 392 - Worker
  • Worker 393 - Worker

Load: 14.73 m³

Duration: 00:14:16

Travel Duration: 00:03:16

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:19

Slack: 22:15:40

Path info

Path ID: 195576

Truck: Truck auto 208 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 207 - Driver
  • Worker 412 - Worker
  • Worker 413 - Worker

Load: 14.93 m³

Duration: 00:13:14

Travel Duration: 00:04:14

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:17

Slack: 22:16:42

Path info

Path ID: 195577

Truck: Truck auto 224 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 223 - Driver
  • Worker 444 - Worker
  • Worker 445 - Worker

Load: 15.04 m³

Duration: 00:12:01

Travel Duration: 00:03:01

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:04

Slack: 22:17:55

Path info

Path ID: 195578

Truck: Truck auto 228 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 227 - Driver
  • Worker 452 - Worker
  • Worker 453 - Worker

Load: 15.78 m³

Duration: 00:14:17

Travel Duration: 00:03:17

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:20

Slack: 22:15:39

Path info

Path ID: 195579

Truck: Truck auto 258 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 257 - Driver
  • Worker 512 - Worker
  • Worker 513 - Worker

Load: 15.37 m³

Duration: 00:13:20

Travel Duration: 00:03:20

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:23

Slack: 22:16:36

Path info

Path ID: 195580

Truck: Truck auto 272 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 271 - Driver
  • Worker 540 - Worker
  • Worker 541 - Worker

Load: 15.37 m³

Duration: 00:16:55

Travel Duration: 00:05:55

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:58

Slack: 22:13:01

Path info

Path ID: 195581

Truck: Truck auto 282 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 281 - Driver
  • Worker 560 - Worker
  • Worker 561 - Worker

Load: 15.97 m³

Duration: 00:14:37

Travel Duration: 00:03:37

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:40

Slack: 22:15:19

Path info

Path ID: 195582

Truck: Truck auto 302 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 301 - Driver
  • Worker 600 - Worker
  • Worker 601 - Worker

Load: 15.37 m³

Duration: 00:14:27

Travel Duration: 00:05:27

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:30

Slack: 22:15:29

Path info

Path ID: 195583

Truck: Truck auto 312 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 311 - Driver
  • Worker 620 - Worker
  • Worker 621 - Worker

Load: 15.95 m³

Duration: 00:12:14

Travel Duration: 00:02:14

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:17

Slack: 22:17:42

Path info

Path ID: 195584

Truck: Truck auto 378 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 377 - Driver
  • Worker 752 - Worker
  • Worker 753 - Worker

Load: 15.99 m³

Duration: 00:14:26

Travel Duration: 00:05:26

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:29

Slack: 22:15:30

Path info

Path ID: 195585

Truck: Truck auto 434 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 433 - Driver
  • Worker 864 - Worker
  • Worker 865 - Worker

Load: 15.83 m³

Duration: 00:15:22

Travel Duration: 00:04:22

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:25

Slack: 22:14:34

Path info

Path ID: 195586

Truck: Truck auto 566 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 565 - Driver
  • Worker 1128 - Worker
  • Worker 1129 - Worker

Load: 13.57 m³

Duration: 00:11:27

Travel Duration: 00:03:27

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:41:30

Slack: 22:18:29

Path info

Path ID: 195587

Truck: Truck auto 586 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 585 - Driver
  • Worker 1168 - Worker
  • Worker 1169 - Worker

Load: 14.26 m³

Duration: 00:11:32

Travel Duration: 00:02:32

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:41:35

Slack: 22:18:24

Path info

Path ID: 195588

Truck: Truck auto 588 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 587 - Driver
  • Worker 1172 - Worker
  • Worker 1173 - Worker

Load: 15.38 m³

Duration: 00:15:12

Travel Duration: 00:04:12

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:15

Slack: 22:14:44

Path info

Path ID: 195589

Truck: Truck auto 598 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 597 - Driver
  • Worker 1192 - Worker
  • Worker 1193 - Worker

Load: 15.86 m³

Duration: 00:13:09

Travel Duration: 00:03:09

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:12

Slack: 22:16:47

Path info

Path ID: 195590

Truck: Truck auto 624 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 623 - Driver
  • Worker 1244 - Worker
  • Worker 1245 - Worker

Load: 15.64 m³

Duration: 00:13:56

Travel Duration: 00:03:56

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:59

Slack: 22:16:00

Path info

Path ID: 195591

Truck: Truck auto 648 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 647 - Driver
  • Worker 1292 - Worker
  • Worker 1293 - Worker

Load: 15.6 m³

Duration: 00:10:51

Travel Duration: 00:02:51

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:40:54

Slack: 22:19:05

Path info

Path ID: 195592

Truck: Truck auto 652 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 651 - Driver
  • Worker 1300 - Worker
  • Worker 1301 - Worker

Load: 14.66 m³

Duration: 00:10:47

Travel Duration: 00:02:47

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:40:50

Slack: 22:19:09

Path info

Path ID: 195593

Truck: Truck auto 768 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 767 - Driver
  • Worker 1532 - Worker
  • Worker 1533 - Worker

Load: 14.3 m³

Duration: 00:12:10

Travel Duration: 00:04:10

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:13

Slack: 22:17:46

Path info

Path ID: 195594

Truck: Truck auto 784 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 783 - Driver
  • Worker 1564 - Worker
  • Worker 1565 - Worker

Load: 15.83 m³

Duration: 00:13:44

Travel Duration: 00:05:44

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:47

Slack: 22:16:12

Path info

Path ID: 195595

Truck: Truck auto 818 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 817 - Driver
  • Worker 1632 - Worker
  • Worker 1633 - Worker

Load: 15.88 m³

Duration: 00:13:32

Travel Duration: 00:04:32

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:35

Slack: 22:16:24

Path info

Path ID: 195596

Truck: Truck auto 836 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 835 - Driver
  • Worker 1668 - Worker
  • Worker 1669 - Worker

Load: 14.89 m³

Duration: 00:17:10

Travel Duration: 00:05:10

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:13

Slack: 22:12:46

Path info

Path ID: 195597

Truck: Truck auto 45 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 44 - Driver
  • Worker 86 - Worker
  • Worker 87 - Worker

Load: 15.95 m³

Duration: 00:15:38

Travel Duration: 00:05:38

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:41

Slack: 22:14:18

Path info

Path ID: 195598

Truck: Truck auto 57 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 56 - Driver
  • Worker 110 - Worker
  • Worker 111 - Worker

Load: 15.96 m³

Duration: 00:15:55

Travel Duration: 00:04:55

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:58

Slack: 22:14:01

Path info

Path ID: 195599

Truck: Truck auto 73 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 72 - Driver
  • Worker 142 - Worker
  • Worker 143 - Worker

Load: 15.88 m³

Duration: 00:13:51

Travel Duration: 00:04:51

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:54

Slack: 22:16:05

Path info

Path ID: 195600

Truck: Truck auto 83 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 82 - Driver
  • Worker 162 - Worker
  • Worker 163 - Worker

Load: 14.65 m³

Duration: 00:13:01

Travel Duration: 00:03:01

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:04

Slack: 22:16:55

Path info

Path ID: 195601

Truck: Truck auto 89 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 88 - Driver
  • Worker 174 - Worker
  • Worker 175 - Worker

Load: 15.5 m³

Duration: 00:14:11

Travel Duration: 00:04:11

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:14

Slack: 22:15:45

Path info

Path ID: 195602

Truck: Truck auto 149 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 148 - Driver
  • Worker 294 - Worker
  • Worker 295 - Worker

Load: 15.7 m³

Duration: 00:13:29

Travel Duration: 00:03:29

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:32

Slack: 22:16:27

Path info

Path ID: 195603

Truck: Truck auto 255 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 254 - Driver
  • Worker 506 - Worker
  • Worker 507 - Worker

Load: 15.88 m³

Duration: 00:13:17

Travel Duration: 00:03:17

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:20

Slack: 22:16:39

Path info

Path ID: 195604

Truck: Truck auto 299 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 298 - Driver
  • Worker 594 - Worker
  • Worker 595 - Worker

Load: 15.52 m³

Duration: 00:14:53

Travel Duration: 00:03:53

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:56

Slack: 22:15:03

Path info

Path ID: 195605

Truck: Truck auto 303 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 302 - Driver
  • Worker 602 - Worker
  • Worker 603 - Worker

Load: 16.0 m³

Duration: 00:16:17

Travel Duration: 00:05:17

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:20

Slack: 22:13:39

Path info

Path ID: 195606

Truck: Truck auto 327 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 326 - Driver
  • Worker 650 - Worker
  • Worker 651 - Worker

Load: 15.55 m³

Duration: 00:14:08

Travel Duration: 00:05:08

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:11

Slack: 22:15:48

Path info

Path ID: 195607

Truck: Truck auto 393 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 392 - Driver
  • Worker 782 - Worker
  • Worker 783 - Worker

Load: 15.96 m³

Duration: 00:13:32

Travel Duration: 00:04:32

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:35

Slack: 22:16:24

Path info

Path ID: 195608

Truck: Truck auto 421 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 420 - Driver
  • Worker 838 - Worker
  • Worker 839 - Worker

Load: 15.44 m³

Duration: 00:13:12

Travel Duration: 00:03:12

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:15

Slack: 22:16:44

Path info

Path ID: 195609

Truck: Truck auto 451 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 450 - Driver
  • Worker 898 - Worker
  • Worker 899 - Worker

Load: 15.21 m³

Duration: 00:15:15

Travel Duration: 00:05:15

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:18

Slack: 22:14:41

Path info

Path ID: 195610

Truck: Truck auto 463 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 462 - Driver
  • Worker 922 - Worker
  • Worker 923 - Worker

Load: 15.56 m³

Duration: 00:13:07

Travel Duration: 00:03:07

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:10

Slack: 22:16:49

Path info

Path ID: 195611

Truck: Truck auto 475 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 474 - Driver
  • Worker 946 - Worker
  • Worker 947 - Worker

Load: 15.91 m³

Duration: 00:14:44

Travel Duration: 00:03:44

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:47

Slack: 22:15:12

Path info

Path ID: 195612

Truck: Truck auto 487 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 486 - Driver
  • Worker 970 - Worker
  • Worker 971 - Worker

Load: 14.54 m³

Duration: 00:12:18

Travel Duration: 00:02:18

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:21

Slack: 22:17:38

Path info

Path ID: 195613

Truck: Truck auto 585 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 584 - Driver
  • Worker 1166 - Worker
  • Worker 1167 - Worker

Load: 15.68 m³

Duration: 00:13:56

Travel Duration: 00:03:56

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:59

Slack: 22:16:00

Path info

Path ID: 195614

Truck: Truck auto 595 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 594 - Driver
  • Worker 1186 - Worker
  • Worker 1187 - Worker

Load: 15.85 m³

Duration: 00:13:35

Travel Duration: 00:03:35

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:38

Slack: 22:16:21

Path info

Path ID: 195615

Truck: Truck auto 601 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 600 - Driver
  • Worker 1198 - Worker
  • Worker 1199 - Worker

Load: 15.54 m³

Duration: 00:14:06

Travel Duration: 00:04:06

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:09

Slack: 22:15:50

Path info

Path ID: 195616

Truck: Truck auto 623 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 622 - Driver
  • Worker 1242 - Worker
  • Worker 1243 - Worker

Load: 15.76 m³

Duration: 00:15:31

Travel Duration: 00:05:31

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:34

Slack: 22:14:25

Path info

Path ID: 195617

Truck: Truck auto 631 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 630 - Driver
  • Worker 1258 - Worker
  • Worker 1259 - Worker

Load: 15.73 m³

Duration: 00:13:21

Travel Duration: 00:03:21

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:24

Slack: 22:16:35

Path info

Path ID: 195618

Truck: Truck auto 673 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 672 - Driver
  • Worker 1342 - Worker
  • Worker 1343 - Worker

Load: 15.01 m³

Duration: 00:15:06

Travel Duration: 00:05:06

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:09

Slack: 22:14:50

Path info

Path ID: 195619

Truck: Truck auto 723 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 722 - Driver
  • Worker 1442 - Worker
  • Worker 1443 - Worker

Load: 15.29 m³

Duration: 00:13:38

Travel Duration: 00:04:38

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:41

Slack: 22:16:18

Path info

Path ID: 195620

Truck: Truck auto 737 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 736 - Driver
  • Worker 1470 - Worker
  • Worker 1471 - Worker

Load: 15.39 m³

Duration: 00:12:29

Travel Duration: 00:02:29

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:32

Slack: 22:17:27

Path info

Path ID: 195621

Truck: Truck auto 793 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 792 - Driver
  • Worker 1582 - Worker
  • Worker 1583 - Worker

Load: 15.8 m³

Duration: 00:17:25

Travel Duration: 00:05:25

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:28

Slack: 22:12:31

Path info

Path ID: 195622

Truck: Truck auto 803 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 802 - Driver
  • Worker 1602 - Worker
  • Worker 1603 - Worker

Load: 14.88 m³

Duration: 00:11:35

Travel Duration: 00:02:35

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:41:38

Slack: 22:18:21

Path info

Path ID: 195623

Truck: Truck auto 805 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 804 - Driver
  • Worker 1606 - Worker
  • Worker 1607 - Worker

Load: 15.74 m³

Duration: 00:12:15

Travel Duration: 00:03:15

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:18

Slack: 22:17:41

Path info

Path ID: 195624

Truck: Truck auto 919 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 918 - Driver
  • Worker 1834 - Worker
  • Worker 1835 - Worker

Load: 13.83 m³

Duration: 00:12:40

Travel Duration: 00:03:40

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:43

Slack: 22:17:16

Path info

Path ID: 195625

Truck: Truck auto 963 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 962 - Driver
  • Worker 1922 - Worker
  • Worker 1923 - Worker

Load: 15.93 m³

Duration: 00:14:01

Travel Duration: 00:04:01

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:04

Slack: 22:15:55

Path info

Path ID: 195626

Truck: Truck auto 17 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 16 - Driver
  • Worker 30 - Worker
  • Worker 31 - Worker

Load: 15.98 m³

Duration: 00:15:00

Travel Duration: 00:05:00

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:03

Slack: 22:14:56

Path info

Path ID: 195627

Truck: Truck auto 67 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 66 - Driver
  • Worker 130 - Worker
  • Worker 131 - Worker

Load: 15.91 m³

Duration: 00:14:57

Travel Duration: 00:05:57

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:00

Slack: 22:14:59

Path info

Path ID: 195628

Truck: Truck auto 71 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 70 - Driver
  • Worker 138 - Worker
  • Worker 139 - Worker

Load: 15.84 m³

Duration: 00:14:09

Travel Duration: 00:05:09

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:12

Slack: 22:15:47

Path info

Path ID: 195629

Truck: Truck auto 77 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 76 - Driver
  • Worker 150 - Worker
  • Worker 151 - Worker

Load: 14.98 m³

Duration: 00:14:47

Travel Duration: 00:04:47

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:50

Slack: 22:15:09

Path info

Path ID: 195630

Truck: Truck auto 93 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 92 - Driver
  • Worker 182 - Worker
  • Worker 183 - Worker

Load: 15.84 m³

Duration: 00:16:14

Travel Duration: 00:05:14

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:17

Slack: 22:13:42

Path info

Path ID: 195631

Truck: Truck auto 139 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 138 - Driver
  • Worker 274 - Worker
  • Worker 275 - Worker

Load: 15.97 m³

Duration: 00:16:23

Travel Duration: 00:06:23

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:26

Slack: 22:13:33

Path info

Path ID: 195632

Truck: Truck auto 153 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 152 - Driver
  • Worker 302 - Worker
  • Worker 303 - Worker

Load: 15.4 m³

Duration: 00:16:07

Travel Duration: 00:06:07

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:10

Slack: 22:13:49

Path info

Path ID: 195633

Truck: Truck auto 229 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 228 - Driver
  • Worker 454 - Worker
  • Worker 455 - Worker

Load: 15.97 m³

Duration: 00:14:50

Travel Duration: 00:05:50

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:53

Slack: 22:15:06

Path info

Path ID: 195634

Truck: Truck auto 463 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 462 - Driver
  • Worker 922 - Worker
  • Worker 923 - Worker

Load: 15.64 m³

Duration: 00:17:16

Travel Duration: 00:05:16

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:19

Slack: 22:12:40

Path info

Path ID: 195635

Truck: Truck auto 465 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 464 - Driver
  • Worker 926 - Worker
  • Worker 927 - Worker

Load: 15.88 m³

Duration: 00:18:53

Travel Duration: 00:05:53

Wait Duration: 00:00:00

Service Duration: 00:13:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:56

Slack: 22:11:03

Path info

Path ID: 195636

Truck: Truck auto 467 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 466 - Driver
  • Worker 930 - Worker
  • Worker 931 - Worker

Load: 15.9 m³

Duration: 00:16:48

Travel Duration: 00:06:48

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:51

Slack: 22:13:08

Path info

Path ID: 195637

Truck: Truck auto 535 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 534 - Driver
  • Worker 1066 - Worker
  • Worker 1067 - Worker

Load: 15.98 m³

Duration: 00:15:29

Travel Duration: 00:05:29

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:32

Slack: 22:14:27

Path info

Path ID: 195638

Truck: Truck auto 601 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 600 - Driver
  • Worker 1198 - Worker
  • Worker 1199 - Worker

Load: 16.0 m³

Duration: 00:15:57

Travel Duration: 00:05:57

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:00

Slack: 22:13:59

Path info

Path ID: 195639

Truck: Truck auto 603 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 602 - Driver
  • Worker 1202 - Worker
  • Worker 1203 - Worker

Load: 15.8 m³

Duration: 00:16:26

Travel Duration: 00:05:26

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:29

Slack: 22:13:30

Path info

Path ID: 195640

Truck: Truck auto 757 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 756 - Driver
  • Worker 1510 - Worker
  • Worker 1511 - Worker

Load: 15.66 m³

Duration: 00:18:03

Travel Duration: 00:07:03

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:06

Slack: 22:11:53

Path info

Path ID: 195641

Truck: Truck auto 857 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 856 - Driver
  • Worker 1710 - Worker
  • Worker 1711 - Worker

Load: 15.93 m³

Duration: 00:15:21

Travel Duration: 00:04:21

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:24

Slack: 22:14:35

Path info

Path ID: 195642

Truck: Truck auto 895 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 894 - Driver
  • Worker 1786 - Worker
  • Worker 1787 - Worker

Load: 15.63 m³

Duration: 00:16:12

Travel Duration: 00:06:12

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:15

Slack: 22:13:44

Path info

Path ID: 195643

Truck: Truck auto 991 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 990 - Driver
  • Worker 1978 - Worker
  • Worker 1979 - Worker

Load: 15.72 m³

Duration: 00:15:24

Travel Duration: 00:05:24

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:27

Slack: 22:14:32

Path info

Path ID: 195644

Truck: Truck auto 995 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 994 - Driver
  • Worker 1986 - Worker
  • Worker 1987 - Worker

Load: 15.83 m³

Duration: 00:14:03

Travel Duration: 00:04:03

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:06

Slack: 22:15:53

Path info

Path ID: 195645

Truck: Truck 4 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • person9 - Driver
  • person8 - Worker
  • person11 - Worker

Load: 15.7 m³

Duration: 00:17:26

Travel Duration: 00:06:26

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:29

Slack: 22:12:30

Path info

Path ID: 195646

Truck: Truck auto 15 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 14 - Driver
  • Worker 26 - Worker
  • Worker 27 - Worker

Load: 15.41 m³

Duration: 00:17:28

Travel Duration: 00:07:28

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:31

Slack: 22:12:28

Path info

Path ID: 195647

Truck: Truck auto 21 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 20 - Driver
  • Worker 38 - Worker
  • Worker 39 - Worker

Load: 15.71 m³

Duration: 00:16:35

Travel Duration: 00:06:35

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:38

Slack: 22:13:21

Path info

Path ID: 195648

Truck: Truck auto 29 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 28 - Driver
  • Worker 54 - Worker
  • Worker 55 - Worker

Load: 15.9 m³

Duration: 00:14:59

Travel Duration: 00:04:59

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:02

Slack: 22:14:57

Path info

Path ID: 195649

Truck: Truck auto 61 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 60 - Driver
  • Worker 118 - Worker
  • Worker 119 - Worker

Load: 15.31 m³

Duration: 00:18:45

Travel Duration: 00:06:45

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:48

Slack: 22:11:11

Path info

Path ID: 195650

Truck: Truck auto 79 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 78 - Driver
  • Worker 154 - Worker
  • Worker 155 - Worker

Load: 15.99 m³

Duration: 00:16:50

Travel Duration: 00:05:50

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:53

Slack: 22:13:06

Path info

Path ID: 195651

Truck: Truck auto 83 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 82 - Driver
  • Worker 162 - Worker
  • Worker 163 - Worker

Load: 15.79 m³

Duration: 00:17:03

Travel Duration: 00:06:03

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:06

Slack: 22:12:53

Path info

Path ID: 195652

Truck: Truck auto 125 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 124 - Driver
  • Worker 246 - Worker
  • Worker 247 - Worker

Load: 15.98 m³

Duration: 00:14:52

Travel Duration: 00:04:52

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:55

Slack: 22:15:04

Path info

Path ID: 195653

Truck: Truck auto 223 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 222 - Driver
  • Worker 442 - Worker
  • Worker 443 - Worker

Load: 15.72 m³

Duration: 00:18:03

Travel Duration: 00:07:03

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:06

Slack: 22:11:53

Path info

Path ID: 195654

Truck: Truck auto 245 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 244 - Driver
  • Worker 486 - Worker
  • Worker 487 - Worker

Load: 15.35 m³

Duration: 00:17:38

Travel Duration: 00:06:38

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:41

Slack: 22:12:18

Path info

Path ID: 195655

Truck: Truck auto 255 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 254 - Driver
  • Worker 506 - Worker
  • Worker 507 - Worker

Load: 16.0 m³

Duration: 00:16:22

Travel Duration: 00:05:22

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:25

Slack: 22:13:34

Path info

Path ID: 195656

Truck: Truck auto 305 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 304 - Driver
  • Worker 606 - Worker
  • Worker 607 - Worker

Load: 14.99 m³

Duration: 00:13:51

Travel Duration: 00:03:51

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:54

Slack: 22:16:05

Path info

Path ID: 195657

Truck: Truck auto 377 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 376 - Driver
  • Worker 750 - Worker
  • Worker 751 - Worker

Load: 15.4 m³

Duration: 00:17:19

Travel Duration: 00:07:19

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:22

Slack: 22:12:37

Path info

Path ID: 195658

Truck: Truck auto 387 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 386 - Driver
  • Worker 770 - Worker
  • Worker 771 - Worker

Load: 15.72 m³

Duration: 00:19:01

Travel Duration: 00:08:01

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:04

Slack: 22:10:55

Path info

Path ID: 195659

Truck: Truck auto 413 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 412 - Driver
  • Worker 822 - Worker
  • Worker 823 - Worker

Load: 15.47 m³

Duration: 00:16:51

Travel Duration: 00:05:51

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:54

Slack: 22:13:05

Path info

Path ID: 195660

Truck: Truck auto 421 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 420 - Driver
  • Worker 838 - Worker
  • Worker 839 - Worker

Load: 13.78 m³

Duration: 00:12:04

Travel Duration: 00:04:04

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:07

Slack: 22:17:52

Path info

Path ID: 195661

Truck: Truck auto 429 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 428 - Driver
  • Worker 854 - Worker
  • Worker 855 - Worker

Load: 15.05 m³

Duration: 00:16:09

Travel Duration: 00:06:09

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:12

Slack: 22:13:47

Path info

Path ID: 195662

Truck: Truck auto 509 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 508 - Driver
  • Worker 1014 - Worker
  • Worker 1015 - Worker

Load: 15.91 m³

Duration: 00:14:01

Travel Duration: 00:05:01

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:04

Slack: 22:15:55

Path info

Path ID: 195663

Truck: Truck auto 597 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 596 - Driver
  • Worker 1190 - Worker
  • Worker 1191 - Worker

Load: 15.92 m³

Duration: 00:16:33

Travel Duration: 00:06:33

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:36

Slack: 22:13:23

Path info

Path ID: 195664

Truck: Truck auto 607 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 606 - Driver
  • Worker 1210 - Worker
  • Worker 1211 - Worker

Load: 14.72 m³

Duration: 00:15:25

Travel Duration: 00:06:25

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:28

Slack: 22:14:31

Path info

Path ID: 195665

Truck: Truck auto 621 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 620 - Driver
  • Worker 1238 - Worker
  • Worker 1239 - Worker

Load: 15.83 m³

Duration: 00:17:26

Travel Duration: 00:06:26

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:29

Slack: 22:12:30

Path info

Path ID: 195666

Truck: Truck auto 627 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 626 - Driver
  • Worker 1250 - Worker
  • Worker 1251 - Worker

Load: 15.94 m³

Duration: 00:15:21

Travel Duration: 00:05:21

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:24

Slack: 22:14:35

Path info

Path ID: 195667

Truck: Truck auto 665 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 664 - Driver
  • Worker 1326 - Worker
  • Worker 1327 - Worker

Load: 14.9 m³

Duration: 00:10:45

Travel Duration: 00:03:45

Wait Duration: 00:00:00

Service Duration: 00:07:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:40:48

Slack: 22:19:11

Path info

Path ID: 195668

Truck: Truck auto 675 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 674 - Driver
  • Worker 1346 - Worker
  • Worker 1347 - Worker

Load: 15.99 m³

Duration: 00:15:45

Travel Duration: 00:04:45

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:48

Slack: 22:14:11

Path info

Path ID: 195669

Truck: Truck auto 691 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 690 - Driver
  • Worker 1378 - Worker
  • Worker 1379 - Worker

Load: 15.97 m³

Duration: 00:15:23

Travel Duration: 00:06:23

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:26

Slack: 22:14:33

Path info

Path ID: 195670

Truck: Truck auto 761 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 760 - Driver
  • Worker 1518 - Worker
  • Worker 1519 - Worker

Load: 14.2 m³

Duration: 00:17:35

Travel Duration: 00:06:35

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:38

Slack: 22:12:21

Path info

Path ID: 195671

Truck: Truck auto 875 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 874 - Driver
  • Worker 1746 - Worker
  • Worker 1747 - Worker

Load: 15.84 m³

Duration: 00:16:20

Travel Duration: 00:06:20

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:23

Slack: 22:13:36

Path info

Path ID: 195672

Truck: Truck auto 4 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 3 - Driver
  • Worker 4 - Worker
  • Worker 5 - Worker

Load: 14.69 m³

Duration: 00:14:35

Travel Duration: 00:04:35

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:38

Slack: 22:15:21

Path info

Path ID: 195673

Truck: Truck auto 8 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 7 - Driver
  • Worker 12 - Worker
  • Worker 13 - Worker

Load: 13.23 m³

Duration: 00:10:13

Travel Duration: 00:02:13

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:40:16

Slack: 22:19:43

Path info

Path ID: 195674

Truck: Truck auto 50 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 49 - Driver
  • Worker 96 - Worker
  • Worker 97 - Worker

Load: 9.79 m³

Duration: 00:08:44

Travel Duration: 00:02:44

Wait Duration: 00:00:00

Service Duration: 00:06:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:38:47

Slack: 22:21:12

Path info

Path ID: 195675

Truck: Truck auto 52 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 51 - Driver
  • Worker 100 - Worker
  • Worker 101 - Worker

Load: 15.37 m³

Duration: 00:13:11

Travel Duration: 00:02:11

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:14

Slack: 22:16:45

Path info

Path ID: 195676

Truck: Truck auto 54 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 53 - Driver
  • Worker 104 - Worker
  • Worker 105 - Worker

Load: 15.24 m³

Duration: 00:13:39

Travel Duration: 00:03:39

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:42

Slack: 22:16:17

Path info

Path ID: 195677

Truck: Truck auto 58 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 57 - Driver
  • Worker 112 - Worker
  • Worker 113 - Worker

Load: 15.67 m³

Duration: 00:11:52

Travel Duration: 00:01:52

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:41:55

Slack: 22:18:04

Path info

Path ID: 195678

Truck: Truck auto 72 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 71 - Driver
  • Worker 140 - Worker
  • Worker 141 - Worker

Load: 14.9 m³

Duration: 00:11:16

Travel Duration: 00:02:16

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:41:19

Slack: 22:18:40

Path info

Path ID: 195679

Truck: Truck auto 82 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 81 - Driver
  • Worker 160 - Worker
  • Worker 161 - Worker

Load: 14.68 m³

Duration: 00:12:47

Travel Duration: 00:02:47

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:50

Slack: 22:17:09

Path info

Path ID: 195680

Truck: Truck auto 90 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 89 - Driver
  • Worker 176 - Worker
  • Worker 177 - Worker

Load: 15.28 m³

Duration: 00:14:53

Travel Duration: 00:02:53

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:56

Slack: 22:15:03

Path info

Path ID: 195681

Truck: Truck auto 140 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 139 - Driver
  • Worker 276 - Worker
  • Worker 277 - Worker

Load: 15.92 m³

Duration: 00:12:21

Travel Duration: 00:02:21

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:24

Slack: 22:17:35

Path info

Path ID: 195682

Truck: Truck auto 160 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 159 - Driver
  • Worker 316 - Worker
  • Worker 317 - Worker

Load: 15.51 m³

Duration: 00:14:05

Travel Duration: 00:03:05

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:08

Slack: 22:15:51

Path info

Path ID: 195683

Truck: Truck auto 162 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 161 - Driver
  • Worker 320 - Worker
  • Worker 321 - Worker

Load: 15.99 m³

Duration: 00:12:45

Travel Duration: 00:03:45

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:48

Slack: 22:17:11

Path info

Path ID: 195684

Truck: Truck auto 182 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 181 - Driver
  • Worker 360 - Worker
  • Worker 361 - Worker

Load: 13.64 m³

Duration: 00:10:46

Travel Duration: 00:01:46

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:40:49

Slack: 22:19:10

Path info

Path ID: 195685

Truck: Truck auto 234 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 233 - Driver
  • Worker 464 - Worker
  • Worker 465 - Worker

Load: 15.0 m³

Duration: 00:11:28

Travel Duration: 00:02:28

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:41:31

Slack: 22:18:28

Path info

Path ID: 195686

Truck: Truck auto 246 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 245 - Driver
  • Worker 488 - Worker
  • Worker 489 - Worker

Load: 11.69 m³

Duration: 00:08:16

Travel Duration: 00:01:16

Wait Duration: 00:00:00

Service Duration: 00:07:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:38:19

Slack: 22:21:40

Path info

Path ID: 195687

Truck: Truck auto 256 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 255 - Driver
  • Worker 508 - Worker
  • Worker 509 - Worker

Load: 15.39 m³

Duration: 00:12:29

Travel Duration: 00:02:29

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:32

Slack: 22:17:27

Path info

Path ID: 195688

Truck: Truck auto 276 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 275 - Driver
  • Worker 548 - Worker
  • Worker 549 - Worker

Load: 13.67 m³

Duration: 00:11:00

Travel Duration: 00:02:00

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:41:03

Slack: 22:18:56

Path info

Path ID: 195689

Truck: Truck auto 278 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 277 - Driver
  • Worker 552 - Worker
  • Worker 553 - Worker

Load: 14.66 m³

Duration: 00:12:16

Travel Duration: 00:03:16

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:19

Slack: 22:17:40

Path info

Path ID: 195690

Truck: Truck auto 426 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 425 - Driver
  • Worker 848 - Worker
  • Worker 849 - Worker

Load: 13.08 m³

Duration: 00:11:16

Travel Duration: 00:03:16

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:41:19

Slack: 22:18:40

Path info

Path ID: 195691

Truck: Truck auto 446 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 445 - Driver
  • Worker 888 - Worker
  • Worker 889 - Worker

Load: 13.93 m³

Duration: 00:11:54

Travel Duration: 00:02:54

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:41:57

Slack: 22:18:02

Path info

Path ID: 195692

Truck: Truck auto 502 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 501 - Driver
  • Worker 1000 - Worker
  • Worker 1001 - Worker

Load: 15.95 m³

Duration: 00:14:53

Travel Duration: 00:03:53

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:56

Slack: 22:15:03

Path info

Path ID: 195693

Truck: Truck auto 540 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 539 - Driver
  • Worker 1076 - Worker
  • Worker 1077 - Worker

Load: 15.79 m³

Duration: 00:15:57

Travel Duration: 00:04:57

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:00

Slack: 22:13:59

Path info

Path ID: 195694

Truck: Truck auto 546 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 545 - Driver
  • Worker 1088 - Worker
  • Worker 1089 - Worker

Load: 14.87 m³

Duration: 00:12:29

Travel Duration: 00:02:29

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:32

Slack: 22:17:27

Path info

Path ID: 195695

Truck: Truck auto 618 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 617 - Driver
  • Worker 1232 - Worker
  • Worker 1233 - Worker

Load: 15.54 m³

Duration: 00:10:39

Travel Duration: 00:01:39

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:40:42

Slack: 22:19:17

Path info

Path ID: 195696

Truck: Truck auto 672 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 671 - Driver
  • Worker 1340 - Worker
  • Worker 1341 - Worker

Load: 14.85 m³

Duration: 00:10:19

Travel Duration: 00:01:19

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:40:22

Slack: 22:19:37

Path info

Path ID: 195697

Truck: Truck auto 710 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 709 - Driver
  • Worker 1416 - Worker
  • Worker 1417 - Worker

Load: 15.54 m³

Duration: 00:12:55

Travel Duration: 00:03:55

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:58

Slack: 22:17:01

Path info

Path ID: 195698

Truck: Truck auto 802 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 801 - Driver
  • Worker 1600 - Worker
  • Worker 1601 - Worker

Load: 10.22 m³

Duration: 00:08:39

Travel Duration: 00:01:39

Wait Duration: 00:00:00

Service Duration: 00:07:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:38:42

Slack: 22:21:17

Path info

Path ID: 195699

Truck: Truck auto 830 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 829 - Driver
  • Worker 1656 - Worker
  • Worker 1657 - Worker

Load: 12.84 m³

Duration: 00:07:58

Travel Duration: 00:01:58

Wait Duration: 00:00:00

Service Duration: 00:06:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:38:01

Slack: 22:21:58

Path info

Path ID: 195700

Truck: Truck auto 836 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 835 - Driver
  • Worker 1668 - Worker
  • Worker 1669 - Worker

Load: 15.61 m³

Duration: 00:13:33

Travel Duration: 00:03:33

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:36

Slack: 22:16:23

Path info

Path ID: 195701

Truck: Truck auto 932 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 931 - Driver
  • Worker 1860 - Worker
  • Worker 1861 - Worker

Load: 13.31 m³

Duration: 00:09:41

Travel Duration: 00:01:41

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:39:44

Slack: 22:20:15

Path info

Path ID: 195702

Truck: Truck auto 974 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 973 - Driver
  • Worker 1944 - Worker
  • Worker 1945 - Worker

Load: 14.22 m³

Duration: 00:10:50

Travel Duration: 00:01:50

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:40:53

Slack: 22:19:06

Path info

Path ID: 195703

Truck: Truck 4 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • person9 - Driver
  • person8 - Worker
  • person11 - Worker

Load: 15.66 m³

Duration: 00:17:32

Travel Duration: 00:07:32

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:35

Slack: 22:12:24

Path info

Path ID: 195704

Truck: Truck auto 25 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 24 - Driver
  • Worker 46 - Worker
  • Worker 47 - Worker

Load: 15.88 m³

Duration: 00:20:15

Travel Duration: 00:09:15

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:50:18

Slack: 22:09:41

Path info

Path ID: 195705

Truck: Truck auto 35 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 34 - Driver
  • Worker 66 - Worker
  • Worker 67 - Worker

Load: 15.76 m³

Duration: 00:18:42

Travel Duration: 00:07:42

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:45

Slack: 22:11:14

Path info

Path ID: 195706

Truck: Truck auto 55 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 54 - Driver
  • Worker 106 - Worker
  • Worker 107 - Worker

Load: 15.67 m³

Duration: 00:17:24

Travel Duration: 00:07:24

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:27

Slack: 22:12:32

Path info

Path ID: 195707

Truck: Truck auto 71 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 70 - Driver
  • Worker 138 - Worker
  • Worker 139 - Worker

Load: 15.52 m³

Duration: 00:18:50

Travel Duration: 00:08:50

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:53

Slack: 22:11:06

Path info

Path ID: 195708

Truck: Truck auto 93 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 92 - Driver
  • Worker 182 - Worker
  • Worker 183 - Worker

Load: 15.99 m³

Duration: 00:20:36

Travel Duration: 00:09:36

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:50:39

Slack: 22:09:20

Path info

Path ID: 195709

Truck: Truck auto 125 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 124 - Driver
  • Worker 246 - Worker
  • Worker 247 - Worker

Load: 15.97 m³

Duration: 00:16:18

Travel Duration: 00:07:18

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:21

Slack: 22:13:38

Path info

Path ID: 195710

Truck: Truck auto 131 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 130 - Driver
  • Worker 258 - Worker
  • Worker 259 - Worker

Load: 15.73 m³

Duration: 00:19:23

Travel Duration: 00:09:23

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:26

Slack: 22:10:33

Path info

Path ID: 195711

Truck: Truck auto 189 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 188 - Driver
  • Worker 374 - Worker
  • Worker 375 - Worker

Load: 15.8 m³

Duration: 00:17:22

Travel Duration: 00:07:22

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:25

Slack: 22:12:34

Path info

Path ID: 195712

Truck: Truck auto 199 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 198 - Driver
  • Worker 394 - Worker
  • Worker 395 - Worker

Load: 15.94 m³

Duration: 00:17:46

Travel Duration: 00:08:46

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:49

Slack: 22:12:10

Path info

Path ID: 195713

Truck: Truck auto 249 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 248 - Driver
  • Worker 494 - Worker
  • Worker 495 - Worker

Load: 15.69 m³

Duration: 00:17:30

Travel Duration: 00:08:30

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:33

Slack: 22:12:26

Path info

Path ID: 195714

Truck: Truck auto 261 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 260 - Driver
  • Worker 518 - Worker
  • Worker 519 - Worker

Load: 15.84 m³

Duration: 00:19:09

Travel Duration: 00:09:09

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:12

Slack: 22:10:47

Path info

Path ID: 195715

Truck: Truck auto 323 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 322 - Driver
  • Worker 642 - Worker
  • Worker 643 - Worker

Load: 15.98 m³

Duration: 00:18:10

Travel Duration: 00:08:10

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:13

Slack: 22:11:46

Path info

Path ID: 195716

Truck: Truck auto 331 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 330 - Driver
  • Worker 658 - Worker
  • Worker 659 - Worker

Load: 16.0 m³

Duration: 00:16:57

Travel Duration: 00:06:57

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:00

Slack: 22:12:59

Path info

Path ID: 195717

Truck: Truck auto 383 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 382 - Driver
  • Worker 762 - Worker
  • Worker 763 - Worker

Load: 15.76 m³

Duration: 00:16:37

Travel Duration: 00:07:37

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:40

Slack: 22:13:19

Path info

Path ID: 195718

Truck: Truck auto 393 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 392 - Driver
  • Worker 782 - Worker
  • Worker 783 - Worker

Load: 16.0 m³

Duration: 00:18:23

Travel Duration: 00:08:23

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:26

Slack: 22:11:33

Path info

Path ID: 195719

Truck: Truck auto 443 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 442 - Driver
  • Worker 882 - Worker
  • Worker 883 - Worker

Load: 15.7 m³

Duration: 00:17:10

Travel Duration: 00:07:10

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:13

Slack: 22:12:46

Path info

Path ID: 195720

Truck: Truck auto 559 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 558 - Driver
  • Worker 1114 - Worker
  • Worker 1115 - Worker

Load: 15.47 m³

Duration: 00:19:31

Travel Duration: 00:09:31

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:34

Slack: 22:10:25

Path info

Path ID: 195721

Truck: Truck auto 611 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 610 - Driver
  • Worker 1218 - Worker
  • Worker 1219 - Worker

Load: 15.99 m³

Duration: 00:18:59

Travel Duration: 00:08:59

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:02

Slack: 22:10:57

Path info

Path ID: 195722

Truck: Truck auto 645 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 644 - Driver
  • Worker 1286 - Worker
  • Worker 1287 - Worker

Load: 15.63 m³

Duration: 00:18:10

Travel Duration: 00:07:10

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:13

Slack: 22:11:46

Path info

Path ID: 195723

Truck: Truck auto 671 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 670 - Driver
  • Worker 1338 - Worker
  • Worker 1339 - Worker

Load: 15.98 m³

Duration: 00:19:43

Travel Duration: 00:09:43

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:46

Slack: 22:10:13

Path info

Path ID: 195724

Truck: Truck auto 689 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 688 - Driver
  • Worker 1374 - Worker
  • Worker 1375 - Worker

Load: 15.68 m³

Duration: 00:19:58

Travel Duration: 00:08:58

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:50:01

Slack: 22:09:58

Path info

Path ID: 195725

Truck: Truck auto 717 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 716 - Driver
  • Worker 1430 - Worker
  • Worker 1431 - Worker

Load: 15.93 m³

Duration: 00:18:00

Travel Duration: 00:08:00

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:03

Slack: 22:11:56

Path info

Path ID: 195726

Truck: Truck auto 793 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 792 - Driver
  • Worker 1582 - Worker
  • Worker 1583 - Worker

Load: 15.77 m³

Duration: 00:19:15

Travel Duration: 00:09:15

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:18

Slack: 22:10:41

Path info

Path ID: 195727

Truck: Truck auto 811 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 810 - Driver
  • Worker 1618 - Worker
  • Worker 1619 - Worker

Load: 15.7 m³

Duration: 00:17:11

Travel Duration: 00:08:11

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:14

Slack: 22:12:45

Path info

Path ID: 195728

Truck: Truck auto 829 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 828 - Driver
  • Worker 1654 - Worker
  • Worker 1655 - Worker

Load: 15.62 m³

Duration: 00:16:36

Travel Duration: 00:08:36

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:39

Slack: 22:13:20

Path info

Path ID: 195729

Truck: Truck auto 849 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 848 - Driver
  • Worker 1694 - Worker
  • Worker 1695 - Worker

Load: 15.64 m³

Duration: 00:18:11

Travel Duration: 00:09:11

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:14

Slack: 22:11:45

Path info

Path ID: 195730

Truck: Truck auto 909 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 908 - Driver
  • Worker 1814 - Worker
  • Worker 1815 - Worker

Load: 15.68 m³

Duration: 00:16:41

Travel Duration: 00:08:41

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:44

Slack: 22:13:15

Path info

Path ID: 195731

Truck: Truck auto 30 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 29 - Driver
  • Worker 56 - Worker
  • Worker 57 - Worker

Load: 15.99 m³

Duration: 00:18:33

Travel Duration: 00:07:33

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:36

Slack: 22:11:23

Path info

Path ID: 195732

Truck: Truck auto 52 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 51 - Driver
  • Worker 100 - Worker
  • Worker 101 - Worker

Load: 15.99 m³

Duration: 00:17:33

Travel Duration: 00:05:33

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:36

Slack: 22:12:23

Path info

Path ID: 195733

Truck: Truck auto 58 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 57 - Driver
  • Worker 112 - Worker
  • Worker 113 - Worker

Load: 15.47 m³

Duration: 00:17:00

Travel Duration: 00:07:00

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:03

Slack: 22:12:56

Path info

Path ID: 195734

Truck: Truck auto 122 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 121 - Driver
  • Worker 240 - Worker
  • Worker 241 - Worker

Load: 15.59 m³

Duration: 00:15:53

Travel Duration: 00:05:53

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:56

Slack: 22:14:03

Path info

Path ID: 195735

Truck: Truck auto 142 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 141 - Driver
  • Worker 280 - Worker
  • Worker 281 - Worker

Load: 16.0 m³

Duration: 00:16:42

Travel Duration: 00:06:42

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:45

Slack: 22:13:14

Path info

Path ID: 195736

Truck: Truck auto 146 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 145 - Driver
  • Worker 288 - Worker
  • Worker 289 - Worker

Load: 15.38 m³

Duration: 00:13:03

Travel Duration: 00:05:03

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:06

Slack: 22:16:53

Path info

Path ID: 195737

Truck: Truck auto 246 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 245 - Driver
  • Worker 488 - Worker
  • Worker 489 - Worker

Load: 15.56 m³

Duration: 00:13:44

Travel Duration: 00:04:44

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:47

Slack: 22:16:12

Path info

Path ID: 195738

Truck: Truck auto 260 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 259 - Driver
  • Worker 516 - Worker
  • Worker 517 - Worker

Load: 15.42 m³

Duration: 00:15:12

Travel Duration: 00:05:12

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:15

Slack: 22:14:44

Path info

Path ID: 195739

Truck: Truck auto 270 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 269 - Driver
  • Worker 536 - Worker
  • Worker 537 - Worker

Load: 15.74 m³

Duration: 00:18:28

Travel Duration: 00:06:28

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:31

Slack: 22:11:28

Path info

Path ID: 195740

Truck: Truck auto 284 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 283 - Driver
  • Worker 564 - Worker
  • Worker 565 - Worker

Load: 15.82 m³

Duration: 00:14:50

Travel Duration: 00:04:50

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:53

Slack: 22:15:06

Path info

Path ID: 195741

Truck: Truck auto 312 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 311 - Driver
  • Worker 620 - Worker
  • Worker 621 - Worker

Load: 15.73 m³

Duration: 00:18:11

Travel Duration: 00:07:11

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:14

Slack: 22:11:45

Path info

Path ID: 195742

Truck: Truck auto 330 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 329 - Driver
  • Worker 656 - Worker
  • Worker 657 - Worker

Load: 14.9 m³

Duration: 00:14:10

Travel Duration: 00:05:10

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:13

Slack: 22:15:46

Path info

Path ID: 195743

Truck: Truck auto 374 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 373 - Driver
  • Worker 744 - Worker
  • Worker 745 - Worker

Load: 15.63 m³

Duration: 00:16:30

Travel Duration: 00:05:30

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:33

Slack: 22:13:26

Path info

Path ID: 195744

Truck: Truck auto 452 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 451 - Driver
  • Worker 900 - Worker
  • Worker 901 - Worker

Load: 15.52 m³

Duration: 00:16:33

Travel Duration: 00:06:33

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:36

Slack: 22:13:23

Path info

Path ID: 195745

Truck: Truck auto 488 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 487 - Driver
  • Worker 972 - Worker
  • Worker 973 - Worker

Load: 15.17 m³

Duration: 00:14:32

Travel Duration: 00:04:32

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:35

Slack: 22:15:24

Path info

Path ID: 195746

Truck: Truck auto 628 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 627 - Driver
  • Worker 1252 - Worker
  • Worker 1253 - Worker

Load: 15.58 m³

Duration: 00:14:19

Travel Duration: 00:05:19

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:22

Slack: 22:15:37

Path info

Path ID: 195747

Truck: Truck auto 648 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 647 - Driver
  • Worker 1292 - Worker
  • Worker 1293 - Worker

Load: 14.54 m³

Duration: 00:15:42

Travel Duration: 00:05:42

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:45

Slack: 22:14:14

Path info

Path ID: 195748

Truck: Truck auto 670 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 669 - Driver
  • Worker 1336 - Worker
  • Worker 1337 - Worker

Load: 15.68 m³

Duration: 00:18:16

Travel Duration: 00:07:16

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:19

Slack: 22:11:40

Path info

Path ID: 195749

Truck: Truck auto 674 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 673 - Driver
  • Worker 1344 - Worker
  • Worker 1345 - Worker

Load: 15.0 m³

Duration: 00:13:26

Travel Duration: 00:04:26

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:29

Slack: 22:16:30

Path info

Path ID: 195750

Truck: Truck auto 680 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 679 - Driver
  • Worker 1356 - Worker
  • Worker 1357 - Worker

Load: 15.49 m³

Duration: 00:16:19

Travel Duration: 00:06:19

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:22

Slack: 22:13:37

Path info

Path ID: 195751

Truck: Truck auto 744 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 743 - Driver
  • Worker 1484 - Worker
  • Worker 1485 - Worker

Load: 14.88 m³

Duration: 00:17:12

Travel Duration: 00:06:12

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:15

Slack: 22:12:44

Path info

Path ID: 195752

Truck: Truck auto 772 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 771 - Driver
  • Worker 1540 - Worker
  • Worker 1541 - Worker

Load: 15.73 m³

Duration: 00:16:50

Travel Duration: 00:06:50

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:53

Slack: 22:13:06

Path info

Path ID: 195753

Truck: Truck auto 868 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 867 - Driver
  • Worker 1732 - Worker
  • Worker 1733 - Worker

Load: 15.97 m³

Duration: 00:17:15

Travel Duration: 00:06:15

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:18

Slack: 22:12:41

Path info

Path ID: 195754

Truck: Truck auto 928 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 927 - Driver
  • Worker 1852 - Worker
  • Worker 1853 - Worker

Load: 15.79 m³

Duration: 00:16:14

Travel Duration: 00:06:14

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:17

Slack: 22:13:42

Path info

Path ID: 195755

Truck: Truck auto 954 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 953 - Driver
  • Worker 1904 - Worker
  • Worker 1905 - Worker

Load: 15.0 m³

Duration: 00:17:59

Travel Duration: 00:06:59

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:02

Slack: 22:11:57

Path info

Path ID: 195756

Truck: Truck auto 974 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 973 - Driver
  • Worker 1944 - Worker
  • Worker 1945 - Worker

Load: 14.41 m³

Duration: 00:12:42

Travel Duration: 00:04:42

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:45

Slack: 22:17:14

Path info

Path ID: 195757

Truck: Truck auto 54 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 53 - Driver
  • Worker 104 - Worker
  • Worker 105 - Worker

Load: 15.81 m³

Duration: 00:19:01

Travel Duration: 00:08:01

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:04

Slack: 22:10:55

Path info

Path ID: 195758

Truck: Truck auto 112 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 111 - Driver
  • Worker 220 - Worker
  • Worker 221 - Worker

Load: 15.96 m³

Duration: 00:17:19

Travel Duration: 00:07:19

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:22

Slack: 22:12:37

Path info

Path ID: 195759

Truck: Truck auto 140 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 139 - Driver
  • Worker 276 - Worker
  • Worker 277 - Worker

Load: 15.8 m³

Duration: 00:16:40

Travel Duration: 00:06:40

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:43

Slack: 22:13:16

Path info

Path ID: 195760

Truck: Truck auto 192 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 191 - Driver
  • Worker 380 - Worker
  • Worker 381 - Worker

Load: 15.6 m³

Duration: 00:17:24

Travel Duration: 00:06:24

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:27

Slack: 22:12:32

Path info

Path ID: 195761

Truck: Truck auto 208 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 207 - Driver
  • Worker 412 - Worker
  • Worker 413 - Worker

Load: 15.52 m³

Duration: 00:18:05

Travel Duration: 00:08:05

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:08

Slack: 22:11:51

Path info

Path ID: 195762

Truck: Truck auto 308 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 307 - Driver
  • Worker 612 - Worker
  • Worker 613 - Worker

Load: 15.5 m³

Duration: 00:16:10

Travel Duration: 00:06:10

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:13

Slack: 22:13:46

Path info

Path ID: 195763

Truck: Truck auto 370 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 369 - Driver
  • Worker 736 - Worker
  • Worker 737 - Worker

Load: 15.53 m³

Duration: 00:16:29

Travel Duration: 00:07:29

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:32

Slack: 22:13:27

Path info

Path ID: 195764

Truck: Truck auto 438 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 437 - Driver
  • Worker 872 - Worker
  • Worker 873 - Worker

Load: 15.83 m³

Duration: 00:19:47

Travel Duration: 00:07:47

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:50

Slack: 22:10:09

Path info

Path ID: 195765

Truck: Truck auto 480 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 479 - Driver
  • Worker 956 - Worker
  • Worker 957 - Worker

Load: 15.64 m³

Duration: 00:16:05

Travel Duration: 00:07:05

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:08

Slack: 22:13:51

Path info

Path ID: 195766

Truck: Truck auto 514 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 513 - Driver
  • Worker 1024 - Worker
  • Worker 1025 - Worker

Load: 15.91 m³

Duration: 00:16:57

Travel Duration: 00:05:57

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:00

Slack: 22:12:59

Path info

Path ID: 195767

Truck: Truck auto 552 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 551 - Driver
  • Worker 1100 - Worker
  • Worker 1101 - Worker

Load: 15.3 m³

Duration: 00:15:34

Travel Duration: 00:06:34

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:37

Slack: 22:14:22

Path info

Path ID: 195768

Truck: Truck auto 562 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 561 - Driver
  • Worker 1120 - Worker
  • Worker 1121 - Worker

Load: 15.41 m³

Duration: 00:15:50

Travel Duration: 00:05:50

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:53

Slack: 22:14:06

Path info

Path ID: 195769

Truck: Truck auto 572 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 571 - Driver
  • Worker 1140 - Worker
  • Worker 1141 - Worker

Load: 15.48 m³

Duration: 00:16:29

Travel Duration: 00:06:29

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:32

Slack: 22:13:27

Path info

Path ID: 195770

Truck: Truck auto 604 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 603 - Driver
  • Worker 1204 - Worker
  • Worker 1205 - Worker

Load: 15.77 m³

Duration: 00:12:36

Travel Duration: 00:04:36

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:39

Slack: 22:17:20

Path info

Path ID: 195771

Truck: Truck auto 608 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 607 - Driver
  • Worker 1212 - Worker
  • Worker 1213 - Worker

Load: 15.09 m³

Duration: 00:18:47

Travel Duration: 00:07:47

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:50

Slack: 22:11:09

Path info

Path ID: 195772

Truck: Truck auto 620 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 619 - Driver
  • Worker 1236 - Worker
  • Worker 1237 - Worker

Load: 15.03 m³

Duration: 00:16:45

Travel Duration: 00:06:45

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:48

Slack: 22:13:11

Path info

Path ID: 195773

Truck: Truck auto 680 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 679 - Driver
  • Worker 1356 - Worker
  • Worker 1357 - Worker

Load: 15.87 m³

Duration: 00:17:05

Travel Duration: 00:06:05

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:08

Slack: 22:12:51

Path info

Path ID: 195774

Truck: Truck auto 802 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 801 - Driver
  • Worker 1600 - Worker
  • Worker 1601 - Worker

Load: 15.13 m³

Duration: 00:15:44

Travel Duration: 00:06:44

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:47

Slack: 22:14:12

Path info

Path ID: 195775

Truck: Truck auto 866 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 865 - Driver
  • Worker 1728 - Worker
  • Worker 1729 - Worker

Load: 15.87 m³

Duration: 00:14:29

Travel Duration: 00:05:29

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:32

Slack: 22:15:27

Path info

Path ID: 195776

Truck: Truck auto 870 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 869 - Driver
  • Worker 1736 - Worker
  • Worker 1737 - Worker

Load: 13.9 m³

Duration: 00:13:59

Travel Duration: 00:04:59

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:02

Slack: 22:15:57

Path info

Path ID: 195777

Truck: Truck auto 960 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 959 - Driver
  • Worker 1916 - Worker
  • Worker 1917 - Worker

Load: 15.97 m³

Duration: 00:15:58

Travel Duration: 00:05:58

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:01

Slack: 22:13:58

Path info

Path ID: 195778

Truck: Truck auto 978 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 977 - Driver
  • Worker 1952 - Worker
  • Worker 1953 - Worker

Load: 14.76 m³

Duration: 00:13:59

Travel Duration: 00:04:59

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:02

Slack: 22:15:57

Path info

Path ID: 195779

Truck: Truck auto 7 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 6 - Driver
  • Worker 10 - Worker
  • Worker 11 - Worker

Load: 15.84 m³

Duration: 00:14:55

Travel Duration: 00:04:55

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:58

Slack: 22:15:01

Path info

Path ID: 195780

Truck: Truck auto 27 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 26 - Driver
  • Worker 50 - Worker
  • Worker 51 - Worker

Load: 15.78 m³

Duration: 00:18:19

Travel Duration: 00:07:19

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:22

Slack: 22:11:37

Path info

Path ID: 195781

Truck: Truck auto 41 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 40 - Driver
  • Worker 78 - Worker
  • Worker 79 - Worker

Load: 15.84 m³

Duration: 00:17:19

Travel Duration: 00:07:19

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:22

Slack: 22:12:37

Path info

Path ID: 195782

Truck: Truck auto 63 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 62 - Driver
  • Worker 122 - Worker
  • Worker 123 - Worker

Load: 15.98 m³

Duration: 00:20:13

Travel Duration: 00:08:13

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:50:16

Slack: 22:09:43

Path info

Path ID: 195783

Truck: Truck auto 83 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 82 - Driver
  • Worker 162 - Worker
  • Worker 163 - Worker

Load: 15.99 m³

Duration: 00:16:46

Travel Duration: 00:05:46

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:49

Slack: 22:13:10

Path info

Path ID: 195784

Truck: Truck auto 89 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 88 - Driver
  • Worker 174 - Worker
  • Worker 175 - Worker

Load: 15.84 m³

Duration: 00:15:59

Travel Duration: 00:05:59

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:02

Slack: 22:13:57

Path info

Path ID: 195785

Truck: Truck auto 137 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 136 - Driver
  • Worker 270 - Worker
  • Worker 271 - Worker

Load: 15.93 m³

Duration: 00:14:52

Travel Duration: 00:04:52

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:55

Slack: 22:15:04

Path info

Path ID: 195786

Truck: Truck auto 171 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 170 - Driver
  • Worker 338 - Worker
  • Worker 339 - Worker

Load: 15.98 m³

Duration: 00:17:22

Travel Duration: 00:07:22

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:25

Slack: 22:12:34

Path info

Path ID: 195787

Truck: Truck auto 183 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 182 - Driver
  • Worker 362 - Worker
  • Worker 363 - Worker

Load: 15.9 m³

Duration: 00:16:05

Travel Duration: 00:07:05

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:08

Slack: 22:13:51

Path info

Path ID: 195788

Truck: Truck auto 203 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 202 - Driver
  • Worker 402 - Worker
  • Worker 403 - Worker

Load: 14.56 m³

Duration: 00:13:16

Travel Duration: 00:05:16

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:19

Slack: 22:16:40

Path info

Path ID: 195789

Truck: Truck auto 241 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 240 - Driver
  • Worker 478 - Worker
  • Worker 479 - Worker

Load: 15.34 m³

Duration: 00:15:37

Travel Duration: 00:05:37

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:40

Slack: 22:14:19

Path info

Path ID: 195790

Truck: Truck auto 251 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 250 - Driver
  • Worker 498 - Worker
  • Worker 499 - Worker

Load: 15.93 m³

Duration: 00:18:28

Travel Duration: 00:07:28

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:31

Slack: 22:11:28

Path info

Path ID: 195791

Truck: Truck auto 257 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 256 - Driver
  • Worker 510 - Worker
  • Worker 511 - Worker

Load: 15.52 m³

Duration: 00:16:58

Travel Duration: 00:05:58

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:01

Slack: 22:12:58

Path info

Path ID: 195792

Truck: Truck auto 305 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 304 - Driver
  • Worker 606 - Worker
  • Worker 607 - Worker

Load: 15.96 m³

Duration: 00:15:16

Travel Duration: 00:05:16

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:19

Slack: 22:14:40

Path info

Path ID: 195793

Truck: Truck auto 341 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 340 - Driver
  • Worker 678 - Worker
  • Worker 679 - Worker

Load: 15.95 m³

Duration: 00:17:45

Travel Duration: 00:07:45

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:48

Slack: 22:12:11

Path info

Path ID: 195794

Truck: Truck auto 383 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 382 - Driver
  • Worker 762 - Worker
  • Worker 763 - Worker

Load: 15.97 m³

Duration: 00:15:54

Travel Duration: 00:06:54

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:57

Slack: 22:14:02

Path info

Path ID: 195795

Truck: Truck auto 397 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 396 - Driver
  • Worker 790 - Worker
  • Worker 791 - Worker

Load: 15.94 m³

Duration: 00:16:10

Travel Duration: 00:06:10

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:13

Slack: 22:13:46

Path info

Path ID: 195796

Truck: Truck auto 457 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 456 - Driver
  • Worker 910 - Worker
  • Worker 911 - Worker

Load: 15.68 m³

Duration: 00:14:21

Travel Duration: 00:05:21

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:24

Slack: 22:15:35

Path info

Path ID: 195797

Truck: Truck auto 479 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 478 - Driver
  • Worker 954 - Worker
  • Worker 955 - Worker

Load: 15.89 m³

Duration: 00:17:22

Travel Duration: 00:07:22

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:25

Slack: 22:12:34

Path info

Path ID: 195798

Truck: Truck auto 545 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 544 - Driver
  • Worker 1086 - Worker
  • Worker 1087 - Worker

Load: 15.92 m³

Duration: 00:13:52

Travel Duration: 00:04:52

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:55

Slack: 22:16:04

Path info

Path ID: 195799

Truck: Truck auto 599 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 598 - Driver
  • Worker 1194 - Worker
  • Worker 1195 - Worker

Load: 15.84 m³

Duration: 00:17:22

Travel Duration: 00:07:22

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:25

Slack: 22:12:34

Path info

Path ID: 195800

Truck: Truck auto 619 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 618 - Driver
  • Worker 1234 - Worker
  • Worker 1235 - Worker

Load: 15.99 m³

Duration: 00:18:12

Travel Duration: 00:08:12

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:15

Slack: 22:11:44

Path info

Path ID: 195801

Truck: Truck auto 911 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 910 - Driver
  • Worker 1818 - Worker
  • Worker 1819 - Worker

Load: 15.96 m³

Duration: 00:16:45

Travel Duration: 00:06:45

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:48

Slack: 22:13:11

Path info

Path ID: 195802

Truck: Truck auto 20 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 19 - Driver
  • Worker 36 - Worker
  • Worker 37 - Worker

Load: 15.78 m³

Duration: 00:18:17

Travel Duration: 00:08:17

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:20

Slack: 22:11:39

Path info

Path ID: 195803

Truck: Truck auto 30 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 29 - Driver
  • Worker 56 - Worker
  • Worker 57 - Worker

Load: 15.82 m³

Duration: 00:18:14

Travel Duration: 00:09:14

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:17

Slack: 22:11:42

Path info

Path ID: 195804

Truck: Truck auto 64 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 63 - Driver
  • Worker 124 - Worker
  • Worker 125 - Worker

Load: 15.76 m³

Duration: 00:21:29

Travel Duration: 00:09:29

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:51:32

Slack: 22:08:27

Path info

Path ID: 195805

Truck: Truck auto 68 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 67 - Driver
  • Worker 132 - Worker
  • Worker 133 - Worker

Load: 15.97 m³

Duration: 00:17:48

Travel Duration: 00:07:48

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:51

Slack: 22:12:08

Path info

Path ID: 195806

Truck: Truck auto 78 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 77 - Driver
  • Worker 152 - Worker
  • Worker 153 - Worker

Load: 15.12 m³

Duration: 00:21:26

Travel Duration: 00:10:26

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:51:29

Slack: 22:08:30

Path info

Path ID: 195807

Truck: Truck auto 80 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 79 - Driver
  • Worker 156 - Worker
  • Worker 157 - Worker

Load: 15.85 m³

Duration: 00:19:07

Travel Duration: 00:09:07

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:10

Slack: 22:10:49

Path info

Path ID: 195808

Truck: Truck auto 132 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 131 - Driver
  • Worker 260 - Worker
  • Worker 261 - Worker

Load: 15.9 m³

Duration: 00:16:19

Travel Duration: 00:07:19

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:22

Slack: 22:13:37

Path info

Path ID: 195809

Truck: Truck auto 138 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 137 - Driver
  • Worker 272 - Worker
  • Worker 273 - Worker

Load: 15.03 m³

Duration: 00:17:42

Travel Duration: 00:08:42

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:45

Slack: 22:12:14

Path info

Path ID: 195810

Truck: Truck auto 142 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 141 - Driver
  • Worker 280 - Worker
  • Worker 281 - Worker

Load: 15.65 m³

Duration: 00:17:25

Travel Duration: 00:07:25

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:28

Slack: 22:12:31

Path info

Path ID: 195811

Truck: Truck auto 166 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 165 - Driver
  • Worker 328 - Worker
  • Worker 329 - Worker

Load: 15.91 m³

Duration: 00:16:56

Travel Duration: 00:06:56

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:59

Slack: 22:13:00

Path info

Path ID: 195812

Truck: Truck auto 174 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 173 - Driver
  • Worker 344 - Worker
  • Worker 345 - Worker

Load: 12.87 m³

Duration: 00:16:56

Travel Duration: 00:08:56

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:59

Slack: 22:13:00

Path info

Path ID: 195813

Truck: Truck auto 180 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 179 - Driver
  • Worker 356 - Worker
  • Worker 357 - Worker

Load: 15.88 m³

Duration: 00:19:24

Travel Duration: 00:08:24

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:27

Slack: 22:10:32

Path info

Path ID: 195814

Truck: Truck auto 224 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 223 - Driver
  • Worker 444 - Worker
  • Worker 445 - Worker

Load: 14.88 m³

Duration: 00:20:32

Travel Duration: 00:09:32

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:50:35

Slack: 22:09:24

Path info

Path ID: 195815

Truck: Truck auto 240 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 239 - Driver
  • Worker 476 - Worker
  • Worker 477 - Worker

Load: 15.78 m³

Duration: 00:17:50

Travel Duration: 00:08:50

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:53

Slack: 22:12:06

Path info

Path ID: 195816

Truck: Truck auto 242 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 241 - Driver
  • Worker 480 - Worker
  • Worker 481 - Worker

Load: 13.7 m³

Duration: 00:16:40

Travel Duration: 00:08:40

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:43

Slack: 22:13:16

Path info

Path ID: 195817

Truck: Truck auto 266 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 265 - Driver
  • Worker 528 - Worker
  • Worker 529 - Worker

Load: 15.28 m³

Duration: 00:19:23

Travel Duration: 00:09:23

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:26

Slack: 22:10:33

Path info

Path ID: 195818

Truck: Truck auto 354 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 353 - Driver
  • Worker 704 - Worker
  • Worker 705 - Worker

Load: 15.79 m³

Duration: 00:18:54

Travel Duration: 00:08:54

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:57

Slack: 22:11:02

Path info

Path ID: 195819

Truck: Truck auto 360 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 359 - Driver
  • Worker 716 - Worker
  • Worker 717 - Worker

Load: 15.36 m³

Duration: 00:18:19

Travel Duration: 00:08:19

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:22

Slack: 22:11:37

Path info

Path ID: 195820

Truck: Truck auto 376 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 375 - Driver
  • Worker 748 - Worker
  • Worker 749 - Worker

Load: 15.47 m³

Duration: 00:16:59

Travel Duration: 00:07:59

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:02

Slack: 22:12:57

Path info

Path ID: 195821

Truck: Truck auto 384 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 383 - Driver
  • Worker 764 - Worker
  • Worker 765 - Worker

Load: 15.81 m³

Duration: 00:17:00

Travel Duration: 00:08:00

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:03

Slack: 22:12:56

Path info

Path ID: 195822

Truck: Truck auto 394 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 393 - Driver
  • Worker 784 - Worker
  • Worker 785 - Worker

Load: 16.0 m³

Duration: 00:17:24

Travel Duration: 00:08:24

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:27

Slack: 22:12:32

Path info

Path ID: 195823

Truck: Truck auto 490 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 489 - Driver
  • Worker 976 - Worker
  • Worker 977 - Worker

Load: 15.91 m³

Duration: 00:17:29

Travel Duration: 00:07:29

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:32

Slack: 22:12:27

Path info

Path ID: 195824

Truck: Truck auto 492 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 491 - Driver
  • Worker 980 - Worker
  • Worker 981 - Worker

Load: 15.68 m³

Duration: 00:18:15

Travel Duration: 00:08:15

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:18

Slack: 22:11:41

Path info

Path ID: 195825

Truck: Truck auto 508 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 507 - Driver
  • Worker 1012 - Worker
  • Worker 1013 - Worker

Load: 13.49 m³

Duration: 00:16:47

Travel Duration: 00:06:47

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:50

Slack: 22:13:09

Path info

Path ID: 195826

Truck: Truck auto 548 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 547 - Driver
  • Worker 1092 - Worker
  • Worker 1093 - Worker

Load: 15.66 m³

Duration: 00:18:31

Travel Duration: 00:08:31

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:34

Slack: 22:11:25

Path info

Path ID: 195827

Truck: Truck auto 780 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 779 - Driver
  • Worker 1556 - Worker
  • Worker 1557 - Worker

Load: 15.76 m³

Duration: 00:19:12

Travel Duration: 00:09:12

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:15

Slack: 22:10:44

Path info

Path ID: 195828

Truck: Truck auto 784 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 783 - Driver
  • Worker 1564 - Worker
  • Worker 1565 - Worker

Load: 15.5 m³

Duration: 00:18:48

Travel Duration: 00:08:48

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:51

Slack: 22:11:08

Path info

Path ID: 195829

Truck: Truck auto 834 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 833 - Driver
  • Worker 1664 - Worker
  • Worker 1665 - Worker

Load: 16.0 m³

Duration: 00:17:08

Travel Duration: 00:07:08

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:11

Slack: 22:12:48

Path info

Path ID: 195830

Truck: Truck auto 928 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 927 - Driver
  • Worker 1852 - Worker
  • Worker 1853 - Worker

Load: 14.81 m³

Duration: 00:15:39

Travel Duration: 00:06:39

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:42

Slack: 22:14:17

Path info

Path ID: 195831

Truck: Truck auto 5 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 4 - Driver
  • Worker 6 - Worker
  • Worker 7 - Worker

Load: 15.85 m³

Duration: 00:15:50

Travel Duration: 00:05:50

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:53

Slack: 22:14:06

Path info

Path ID: 195832

Truck: Truck auto 43 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 42 - Driver
  • Worker 82 - Worker
  • Worker 83 - Worker

Load: 15.7 m³

Duration: 00:18:44

Travel Duration: 00:07:44

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:47

Slack: 22:11:12

Path info

Path ID: 195833

Truck: Truck auto 129 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 128 - Driver
  • Worker 254 - Worker
  • Worker 255 - Worker

Load: 15.02 m³

Duration: 00:18:28

Travel Duration: 00:07:28

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:31

Slack: 22:11:28

Path info

Path ID: 195834

Truck: Truck auto 235 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 234 - Driver
  • Worker 466 - Worker
  • Worker 467 - Worker

Load: 15.76 m³

Duration: 00:18:06

Travel Duration: 00:07:06

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:09

Slack: 22:11:50

Path info

Path ID: 195835

Truck: Truck auto 279 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 278 - Driver
  • Worker 554 - Worker
  • Worker 555 - Worker

Load: 15.94 m³

Duration: 00:19:08

Travel Duration: 00:09:08

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:11

Slack: 22:10:48

Path info

Path ID: 195836

Truck: Truck auto 339 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 338 - Driver
  • Worker 674 - Worker
  • Worker 675 - Worker

Load: 15.76 m³

Duration: 00:19:29

Travel Duration: 00:08:29

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:32

Slack: 22:10:27

Path info

Path ID: 195837

Truck: Truck auto 353 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 352 - Driver
  • Worker 702 - Worker
  • Worker 703 - Worker

Load: 15.43 m³

Duration: 00:19:27

Travel Duration: 00:07:27

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:30

Slack: 22:10:29

Path info

Path ID: 195838

Truck: Truck auto 377 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 376 - Driver
  • Worker 750 - Worker
  • Worker 751 - Worker

Load: 15.18 m³

Duration: 00:15:03

Travel Duration: 00:06:03

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:06

Slack: 22:14:53

Path info

Path ID: 195839

Truck: Truck auto 389 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 388 - Driver
  • Worker 774 - Worker
  • Worker 775 - Worker

Load: 15.83 m³

Duration: 00:16:55

Travel Duration: 00:07:55

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:58

Slack: 22:13:01

Path info

Path ID: 195840

Truck: Truck auto 407 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 406 - Driver
  • Worker 810 - Worker
  • Worker 811 - Worker

Load: 15.18 m³

Duration: 00:17:59

Travel Duration: 00:07:59

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:02

Slack: 22:11:57

Path info

Path ID: 195841

Truck: Truck auto 453 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 452 - Driver
  • Worker 902 - Worker
  • Worker 903 - Worker

Load: 15.69 m³

Duration: 00:17:59

Travel Duration: 00:07:59

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:02

Slack: 22:11:57

Path info

Path ID: 195842

Truck: Truck auto 495 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 494 - Driver
  • Worker 986 - Worker
  • Worker 987 - Worker

Load: 14.95 m³

Duration: 00:13:41

Travel Duration: 00:05:41

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:44

Slack: 22:16:15

Path info

Path ID: 195843

Truck: Truck auto 533 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 532 - Driver
  • Worker 1062 - Worker
  • Worker 1063 - Worker

Load: 15.14 m³

Duration: 00:14:23

Travel Duration: 00:05:23

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:26

Slack: 22:15:33

Path info

Path ID: 195844

Truck: Truck auto 593 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 592 - Driver
  • Worker 1182 - Worker
  • Worker 1183 - Worker

Load: 15.96 m³

Duration: 00:19:04

Travel Duration: 00:09:04

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:07

Slack: 22:10:52

Path info

Path ID: 195845

Truck: Truck auto 595 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 594 - Driver
  • Worker 1186 - Worker
  • Worker 1187 - Worker

Load: 15.95 m³

Duration: 00:18:42

Travel Duration: 00:08:42

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:45

Slack: 22:11:14

Path info

Path ID: 195846

Truck: Truck auto 629 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 628 - Driver
  • Worker 1254 - Worker
  • Worker 1255 - Worker

Load: 15.95 m³

Duration: 00:17:56

Travel Duration: 00:07:56

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:59

Slack: 22:12:00

Path info

Path ID: 195847

Truck: Truck auto 655 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 654 - Driver
  • Worker 1306 - Worker
  • Worker 1307 - Worker

Load: 15.87 m³

Duration: 00:19:08

Travel Duration: 00:08:08

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:11

Slack: 22:10:48

Path info

Path ID: 195848

Truck: Truck auto 677 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 676 - Driver
  • Worker 1350 - Worker
  • Worker 1351 - Worker

Load: 15.74 m³

Duration: 00:17:10

Travel Duration: 00:07:10

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:13

Slack: 22:12:46

Path info

Path ID: 195849

Truck: Truck auto 693 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 692 - Driver
  • Worker 1382 - Worker
  • Worker 1383 - Worker

Load: 15.84 m³

Duration: 00:17:34

Travel Duration: 00:07:34

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:37

Slack: 22:12:22

Path info

Path ID: 195850

Truck: Truck auto 933 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 932 - Driver
  • Worker 1862 - Worker
  • Worker 1863 - Worker

Load: 15.71 m³

Duration: 00:17:17

Travel Duration: 00:08:17

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:20

Slack: 22:12:39

Path info

Path ID: 195851

Truck: Truck auto 947 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 946 - Driver
  • Worker 1890 - Worker
  • Worker 1891 - Worker

Load: 15.16 m³

Duration: 00:15:33

Travel Duration: 00:05:33

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:36

Slack: 22:14:23

Path info

Path ID: 195852

Truck: Truck auto 961 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 960 - Driver
  • Worker 1918 - Worker
  • Worker 1919 - Worker

Load: 15.85 m³

Duration: 00:18:58

Travel Duration: 00:08:58

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:01

Slack: 22:10:58

Path info

Path ID: 195853

Truck: Truck auto 13 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 12 - Driver
  • Worker 22 - Worker
  • Worker 23 - Worker

Load: 15.92 m³

Duration: 00:12:00

Travel Duration: 00:04:00

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:03

Slack: 22:17:56

Path info

Path ID: 195854

Truck: Truck auto 63 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 62 - Driver
  • Worker 122 - Worker
  • Worker 123 - Worker

Load: 15.81 m³

Duration: 00:13:04

Travel Duration: 00:04:04

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:07

Slack: 22:16:52

Path info

Path ID: 195855

Truck: Truck auto 99 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 98 - Driver
  • Worker 194 - Worker
  • Worker 195 - Worker

Load: 15.96 m³

Duration: 00:14:37

Travel Duration: 00:03:37

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:40

Slack: 22:15:19

Path info

Path ID: 195856

Truck: Truck auto 105 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 104 - Driver
  • Worker 206 - Worker
  • Worker 207 - Worker

Load: 15.67 m³

Duration: 00:13:01

Travel Duration: 00:03:01

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:04

Slack: 22:16:55

Path info

Path ID: 195857

Truck: Truck auto 183 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 182 - Driver
  • Worker 362 - Worker
  • Worker 363 - Worker

Load: 15.77 m³

Duration: 00:12:10

Travel Duration: 00:02:10

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:13

Slack: 22:17:46

Path info

Path ID: 195858

Truck: Truck auto 187 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 186 - Driver
  • Worker 370 - Worker
  • Worker 371 - Worker

Load: 15.8 m³

Duration: 00:10:46

Travel Duration: 00:01:46

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:40:49

Slack: 22:19:10

Path info

Path ID: 195859

Truck: Truck auto 231 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 230 - Driver
  • Worker 458 - Worker
  • Worker 459 - Worker

Load: 13.61 m³

Duration: 00:11:08

Travel Duration: 00:02:08

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:41:11

Slack: 22:18:48

Path info

Path ID: 195860

Truck: Truck auto 235 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 234 - Driver
  • Worker 466 - Worker
  • Worker 467 - Worker

Load: 13.84 m³

Duration: 00:10:08

Travel Duration: 00:01:08

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:40:11

Slack: 22:19:48

Path info

Path ID: 195861

Truck: Truck auto 271 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 270 - Driver
  • Worker 538 - Worker
  • Worker 539 - Worker

Load: 15.91 m³

Duration: 00:12:32

Travel Duration: 00:02:32

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:35

Slack: 22:17:24

Path info

Path ID: 195862

Truck: Truck auto 305 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 304 - Driver
  • Worker 606 - Worker
  • Worker 607 - Worker

Load: 15.9 m³

Duration: 00:12:26

Travel Duration: 00:02:26

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:29

Slack: 22:17:30

Path info

Path ID: 195863

Truck: Truck auto 313 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 312 - Driver
  • Worker 622 - Worker
  • Worker 623 - Worker

Load: 16.0 m³

Duration: 00:13:20

Travel Duration: 00:02:20

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:23

Slack: 22:16:36

Path info

Path ID: 195864

Truck: Truck auto 359 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 358 - Driver
  • Worker 714 - Worker
  • Worker 715 - Worker

Load: 14.46 m³

Duration: 00:10:41

Travel Duration: 00:01:41

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:40:44

Slack: 22:19:15

Path info

Path ID: 195865

Truck: Truck auto 379 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 378 - Driver
  • Worker 754 - Worker
  • Worker 755 - Worker

Load: 15.97 m³

Duration: 00:14:01

Travel Duration: 00:03:01

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:04

Slack: 22:15:55

Path info

Path ID: 195866

Truck: Truck auto 383 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 382 - Driver
  • Worker 762 - Worker
  • Worker 763 - Worker

Load: 15.1 m³

Duration: 00:12:21

Travel Duration: 00:01:21

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:24

Slack: 22:17:35

Path info

Path ID: 195867

Truck: Truck auto 393 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 392 - Driver
  • Worker 782 - Worker
  • Worker 783 - Worker

Load: 15.39 m³

Duration: 00:13:42

Travel Duration: 00:03:42

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:45

Slack: 22:16:14

Path info

Path ID: 195868

Truck: Truck auto 447 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 446 - Driver
  • Worker 890 - Worker
  • Worker 891 - Worker

Load: 15.02 m³

Duration: 00:11:37

Travel Duration: 00:01:37

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:41:40

Slack: 22:18:19

Path info

Path ID: 195869

Truck: Truck auto 449 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 448 - Driver
  • Worker 894 - Worker
  • Worker 895 - Worker

Load: 15.33 m³

Duration: 00:14:30

Travel Duration: 00:02:30

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:33

Slack: 22:15:26

Path info

Path ID: 195870

Truck: Truck auto 451 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 450 - Driver
  • Worker 898 - Worker
  • Worker 899 - Worker

Load: 15.99 m³

Duration: 00:12:53

Travel Duration: 00:02:53

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:56

Slack: 22:17:03

Path info

Path ID: 195871

Truck: Truck auto 463 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 462 - Driver
  • Worker 922 - Worker
  • Worker 923 - Worker

Load: 15.76 m³

Duration: 00:15:47

Travel Duration: 00:03:47

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:50

Slack: 22:14:09

Path info

Path ID: 195872

Truck: Truck auto 511 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 510 - Driver
  • Worker 1018 - Worker
  • Worker 1019 - Worker

Load: 15.48 m³

Duration: 00:12:55

Travel Duration: 00:01:55

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:58

Slack: 22:17:01

Path info

Path ID: 195873

Truck: Truck auto 539 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 538 - Driver
  • Worker 1074 - Worker
  • Worker 1075 - Worker

Load: 15.78 m³

Duration: 00:13:10

Travel Duration: 00:03:10

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:13

Slack: 22:16:46

Path info

Path ID: 195874

Truck: Truck auto 597 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 596 - Driver
  • Worker 1190 - Worker
  • Worker 1191 - Worker

Load: 15.77 m³

Duration: 00:13:34

Travel Duration: 00:04:34

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:37

Slack: 22:16:22

Path info

Path ID: 195875

Truck: Truck auto 605 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 604 - Driver
  • Worker 1206 - Worker
  • Worker 1207 - Worker

Load: 15.35 m³

Duration: 00:11:51

Travel Duration: 00:02:51

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:41:54

Slack: 22:18:05

Path info

Path ID: 195876

Truck: Truck auto 631 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 630 - Driver
  • Worker 1258 - Worker
  • Worker 1259 - Worker

Load: 15.61 m³

Duration: 00:13:32

Travel Duration: 00:03:32

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:35

Slack: 22:16:24

Path info

Path ID: 195877

Truck: Truck auto 713 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 712 - Driver
  • Worker 1422 - Worker
  • Worker 1423 - Worker

Load: 15.65 m³

Duration: 00:13:50

Travel Duration: 00:03:50

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:53

Slack: 22:16:06

Path info

Path ID: 195878

Truck: Truck auto 741 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 740 - Driver
  • Worker 1478 - Worker
  • Worker 1479 - Worker

Load: 15.57 m³

Duration: 00:11:52

Travel Duration: 00:02:52

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:41:55

Slack: 22:18:04

Path info

Path ID: 195879

Truck: Truck auto 805 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 804 - Driver
  • Worker 1606 - Worker
  • Worker 1607 - Worker

Load: 15.44 m³

Duration: 00:13:28

Travel Duration: 00:03:28

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:31

Slack: 22:16:28

Path info

Path ID: 195880

Truck: Truck auto 935 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 934 - Driver
  • Worker 1866 - Worker
  • Worker 1867 - Worker

Load: 14.41 m³

Duration: 00:13:40

Travel Duration: 00:02:40

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:43

Slack: 22:16:16

Path info

Path ID: 195881

Truck: Truck auto 54 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 53 - Driver
  • Worker 104 - Worker
  • Worker 105 - Worker

Load: 15.5 m³

Duration: 00:16:30

Travel Duration: 00:07:30

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:33

Slack: 22:13:26

Path info

Path ID: 195882

Truck: Truck auto 64 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 63 - Driver
  • Worker 124 - Worker
  • Worker 125 - Worker

Load: 14.84 m³

Duration: 00:17:32

Travel Duration: 00:08:32

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:35

Slack: 22:12:24

Path info

Path ID: 195883

Truck: Truck auto 102 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 101 - Driver
  • Worker 200 - Worker
  • Worker 201 - Worker

Load: 15.78 m³

Duration: 00:17:57

Travel Duration: 00:06:57

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:00

Slack: 22:11:59

Path info

Path ID: 195884

Truck: Truck auto 110 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 109 - Driver
  • Worker 216 - Worker
  • Worker 217 - Worker

Load: 15.94 m³

Duration: 00:18:12

Travel Duration: 00:08:12

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:15

Slack: 22:11:44

Path info

Path ID: 195885

Truck: Truck auto 122 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 121 - Driver
  • Worker 240 - Worker
  • Worker 241 - Worker

Load: 15.98 m³

Duration: 00:18:25

Travel Duration: 00:08:25

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:28

Slack: 22:11:31

Path info

Path ID: 195886

Truck: Truck auto 186 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 185 - Driver
  • Worker 368 - Worker
  • Worker 369 - Worker

Load: 15.4 m³

Duration: 00:17:11

Travel Duration: 00:06:11

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:14

Slack: 22:12:45

Path info

Path ID: 195887

Truck: Truck auto 246 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 245 - Driver
  • Worker 488 - Worker
  • Worker 489 - Worker

Load: 15.95 m³

Duration: 00:18:20

Travel Duration: 00:08:20

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:23

Slack: 22:11:36

Path info

Path ID: 195888

Truck: Truck auto 252 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 251 - Driver
  • Worker 500 - Worker
  • Worker 501 - Worker

Load: 15.71 m³

Duration: 00:17:22

Travel Duration: 00:08:22

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:25

Slack: 22:12:34

Path info

Path ID: 195889

Truck: Truck auto 256 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 255 - Driver
  • Worker 508 - Worker
  • Worker 509 - Worker

Load: 15.99 m³

Duration: 00:17:30

Travel Duration: 00:07:30

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:33

Slack: 22:12:26

Path info

Path ID: 195890

Truck: Truck auto 304 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 303 - Driver
  • Worker 604 - Worker
  • Worker 605 - Worker

Load: 15.85 m³

Duration: 00:15:50

Travel Duration: 00:06:50

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:53

Slack: 22:14:06

Path info

Path ID: 195891

Truck: Truck auto 324 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 323 - Driver
  • Worker 644 - Worker
  • Worker 645 - Worker

Load: 15.91 m³

Duration: 00:17:45

Travel Duration: 00:07:45

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:48

Slack: 22:12:11

Path info

Path ID: 195892

Truck: Truck auto 342 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 341 - Driver
  • Worker 680 - Worker
  • Worker 681 - Worker

Load: 15.66 m³

Duration: 00:18:05

Travel Duration: 00:08:05

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:08

Slack: 22:11:51

Path info

Path ID: 195893

Truck: Truck auto 366 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 365 - Driver
  • Worker 728 - Worker
  • Worker 729 - Worker

Load: 15.65 m³

Duration: 00:18:27

Travel Duration: 00:07:27

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:30

Slack: 22:11:29

Path info

Path ID: 195894

Truck: Truck auto 380 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 379 - Driver
  • Worker 756 - Worker
  • Worker 757 - Worker

Load: 15.34 m³

Duration: 00:18:52

Travel Duration: 00:07:52

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:55

Slack: 22:11:04

Path info

Path ID: 195895

Truck: Truck auto 434 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 433 - Driver
  • Worker 864 - Worker
  • Worker 865 - Worker

Load: 15.77 m³

Duration: 00:19:03

Travel Duration: 00:09:03

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:06

Slack: 22:10:53

Path info

Path ID: 195896

Truck: Truck auto 440 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 439 - Driver
  • Worker 876 - Worker
  • Worker 877 - Worker

Load: 15.11 m³

Duration: 00:15:51

Travel Duration: 00:07:51

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:54

Slack: 22:14:05

Path info

Path ID: 195897

Truck: Truck auto 458 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 457 - Driver
  • Worker 912 - Worker
  • Worker 913 - Worker

Load: 14.94 m³

Duration: 00:14:43

Travel Duration: 00:05:43

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:46

Slack: 22:15:13

Path info

Path ID: 195898

Truck: Truck auto 530 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 529 - Driver
  • Worker 1056 - Worker
  • Worker 1057 - Worker

Load: 11.41 m³

Duration: 00:12:14

Travel Duration: 00:05:14

Wait Duration: 00:00:00

Service Duration: 00:07:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:42:17

Slack: 22:17:42

Path info

Path ID: 195899

Truck: Truck auto 546 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 545 - Driver
  • Worker 1088 - Worker
  • Worker 1089 - Worker

Load: 15.95 m³

Duration: 00:17:31

Travel Duration: 00:08:31

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:34

Slack: 22:12:25

Path info

Path ID: 195900

Truck: Truck auto 558 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 557 - Driver
  • Worker 1112 - Worker
  • Worker 1113 - Worker

Load: 15.29 m³

Duration: 00:15:23

Travel Duration: 00:05:23

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:26

Slack: 22:14:33

Path info

Path ID: 195901

Truck: Truck auto 606 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 605 - Driver
  • Worker 1208 - Worker
  • Worker 1209 - Worker

Load: 15.87 m³

Duration: 00:16:56

Travel Duration: 00:05:56

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:59

Slack: 22:13:00

Path info

Path ID: 195902

Truck: Truck auto 646 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 645 - Driver
  • Worker 1288 - Worker
  • Worker 1289 - Worker

Load: 15.92 m³

Duration: 00:17:21

Travel Duration: 00:07:21

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:24

Slack: 22:12:35

Path info

Path ID: 195903

Truck: Truck auto 994 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 993 - Driver
  • Worker 1984 - Worker
  • Worker 1985 - Worker

Load: 15.93 m³

Duration: 00:17:43

Travel Duration: 00:07:43

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:46

Slack: 22:12:13

Path info

Path ID: 195904

Truck: Truck auto 47 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 46 - Driver
  • Worker 90 - Worker
  • Worker 91 - Worker

Load: 15.87 m³

Duration: 00:17:00

Travel Duration: 00:07:00

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:03

Slack: 22:12:56

Path info

Path ID: 195905

Truck: Truck auto 59 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 58 - Driver
  • Worker 114 - Worker
  • Worker 115 - Worker

Load: 15.11 m³

Duration: 00:15:26

Travel Duration: 00:06:26

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:29

Slack: 22:14:30

Path info

Path ID: 195906

Truck: Truck auto 65 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 64 - Driver
  • Worker 126 - Worker
  • Worker 127 - Worker

Load: 15.98 m³

Duration: 00:19:50

Travel Duration: 00:07:50

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:53

Slack: 22:10:06

Path info

Path ID: 195907

Truck: Truck auto 79 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 78 - Driver
  • Worker 154 - Worker
  • Worker 155 - Worker

Load: 14.43 m³

Duration: 00:18:33

Travel Duration: 00:07:33

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:36

Slack: 22:11:23

Path info

Path ID: 195908

Truck: Truck auto 123 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 122 - Driver
  • Worker 242 - Worker
  • Worker 243 - Worker

Load: 15.99 m³

Duration: 00:16:58

Travel Duration: 00:05:58

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:01

Slack: 22:12:58

Path info

Path ID: 195909

Truck: Truck auto 223 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 222 - Driver
  • Worker 442 - Worker
  • Worker 443 - Worker

Load: 13.82 m³

Duration: 00:14:11

Travel Duration: 00:05:11

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:14

Slack: 22:15:45

Path info

Path ID: 195910

Truck: Truck auto 253 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 252 - Driver
  • Worker 502 - Worker
  • Worker 503 - Worker

Load: 15.65 m³

Duration: 00:18:18

Travel Duration: 00:07:18

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:21

Slack: 22:11:38

Path info

Path ID: 195911

Truck: Truck auto 261 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 260 - Driver
  • Worker 518 - Worker
  • Worker 519 - Worker

Load: 15.4 m³

Duration: 00:15:58

Travel Duration: 00:05:58

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:01

Slack: 22:13:58

Path info

Path ID: 195912

Truck: Truck auto 297 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 296 - Driver
  • Worker 590 - Worker
  • Worker 591 - Worker

Load: 15.85 m³

Duration: 00:16:01

Travel Duration: 00:07:01

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:04

Slack: 22:13:55

Path info

Path ID: 195913

Truck: Truck auto 347 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 346 - Driver
  • Worker 690 - Worker
  • Worker 691 - Worker

Load: 15.89 m³

Duration: 00:16:05

Travel Duration: 00:06:05

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:08

Slack: 22:13:51

Path info

Path ID: 195914

Truck: Truck auto 349 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 348 - Driver
  • Worker 694 - Worker
  • Worker 695 - Worker

Load: 14.83 m³

Duration: 00:18:35

Travel Duration: 00:07:35

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:38

Slack: 22:11:21

Path info

Path ID: 195915

Truck: Truck auto 435 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 434 - Driver
  • Worker 866 - Worker
  • Worker 867 - Worker

Load: 15.63 m³

Duration: 00:13:56

Travel Duration: 00:05:56

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:59

Slack: 22:16:00

Path info

Path ID: 195916

Truck: Truck auto 519 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 518 - Driver
  • Worker 1034 - Worker
  • Worker 1035 - Worker

Load: 15.86 m³

Duration: 00:16:59

Travel Duration: 00:06:59

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:02

Slack: 22:12:57

Path info

Path ID: 195917

Truck: Truck auto 533 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 532 - Driver
  • Worker 1062 - Worker
  • Worker 1063 - Worker

Load: 15.94 m³

Duration: 00:18:54

Travel Duration: 00:07:54

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:57

Slack: 22:11:02

Path info

Path ID: 195918

Truck: Truck auto 553 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 552 - Driver
  • Worker 1102 - Worker
  • Worker 1103 - Worker

Load: 15.67 m³

Duration: 00:17:51

Travel Duration: 00:07:51

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:54

Slack: 22:12:05

Path info

Path ID: 195919

Truck: Truck auto 557 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 556 - Driver
  • Worker 1110 - Worker
  • Worker 1111 - Worker

Load: 15.6 m³

Duration: 00:17:47

Travel Duration: 00:07:47

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:50

Slack: 22:12:09

Path info

Path ID: 195920

Truck: Truck auto 613 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 612 - Driver
  • Worker 1222 - Worker
  • Worker 1223 - Worker

Load: 15.8 m³

Duration: 00:17:11

Travel Duration: 00:07:11

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:14

Slack: 22:12:45

Path info

Path ID: 195921

Truck: Truck auto 693 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 692 - Driver
  • Worker 1382 - Worker
  • Worker 1383 - Worker

Load: 15.63 m³

Duration: 00:14:09

Travel Duration: 00:05:09

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:12

Slack: 22:15:47

Path info

Path ID: 195922

Truck: Truck auto 709 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 708 - Driver
  • Worker 1414 - Worker
  • Worker 1415 - Worker

Load: 15.84 m³

Duration: 00:15:26

Travel Duration: 00:06:26

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:29

Slack: 22:14:30

Path info

Path ID: 195923

Truck: Truck auto 743 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 742 - Driver
  • Worker 1482 - Worker
  • Worker 1483 - Worker

Load: 16.0 m³

Duration: 00:15:29

Travel Duration: 00:06:29

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:32

Slack: 22:14:27

Path info

Path ID: 195924

Truck: Truck auto 747 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 746 - Driver
  • Worker 1490 - Worker
  • Worker 1491 - Worker

Load: 15.67 m³

Duration: 00:17:52

Travel Duration: 00:06:52

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:55

Slack: 22:12:04

Path info

Path ID: 195925

Truck: Truck auto 775 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 774 - Driver
  • Worker 1546 - Worker
  • Worker 1547 - Worker

Load: 15.57 m³

Duration: 00:16:38

Travel Duration: 00:07:38

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:41

Slack: 22:13:18

Path info

Path ID: 195926

Truck: Truck auto 785 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 784 - Driver
  • Worker 1566 - Worker
  • Worker 1567 - Worker

Load: 15.77 m³

Duration: 00:13:55

Travel Duration: 00:04:55

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:58

Slack: 22:16:01

Path info

Path ID: 195927

Truck: Truck auto 74 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 73 - Driver
  • Worker 144 - Worker
  • Worker 145 - Worker

Load: 16.0 m³

Duration: 00:17:55

Travel Duration: 00:06:55

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:58

Slack: 22:12:01

Path info

Path ID: 195928

Truck: Truck auto 112 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 111 - Driver
  • Worker 220 - Worker
  • Worker 221 - Worker

Load: 14.65 m³

Duration: 00:14:53

Travel Duration: 00:05:53

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:56

Slack: 22:15:03

Path info

Path ID: 195929

Truck: Truck auto 138 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 137 - Driver
  • Worker 272 - Worker
  • Worker 273 - Worker

Load: 15.76 m³

Duration: 00:16:39

Travel Duration: 00:06:39

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:42

Slack: 22:13:17

Path info

Path ID: 195930

Truck: Truck auto 146 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 145 - Driver
  • Worker 288 - Worker
  • Worker 289 - Worker

Load: 14.21 m³

Duration: 00:17:48

Travel Duration: 00:07:48

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:51

Slack: 22:12:08

Path info

Path ID: 195931

Truck: Truck auto 164 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 163 - Driver
  • Worker 324 - Worker
  • Worker 325 - Worker

Load: 15.58 m³

Duration: 00:15:23

Travel Duration: 00:05:23

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:26

Slack: 22:14:33

Path info

Path ID: 195932

Truck: Truck auto 166 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 165 - Driver
  • Worker 328 - Worker
  • Worker 329 - Worker

Load: 15.63 m³

Duration: 00:16:27

Travel Duration: 00:05:27

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:30

Slack: 22:13:29

Path info

Path ID: 195933

Truck: Truck auto 170 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 169 - Driver
  • Worker 336 - Worker
  • Worker 337 - Worker

Load: 15.8 m³

Duration: 00:15:31

Travel Duration: 00:06:31

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:34

Slack: 22:14:25

Path info

Path ID: 195934

Truck: Truck auto 176 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 175 - Driver
  • Worker 348 - Worker
  • Worker 349 - Worker

Load: 14.36 m³

Duration: 00:17:40

Travel Duration: 00:06:40

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:43

Slack: 22:12:16

Path info

Path ID: 195935

Truck: Truck auto 238 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 237 - Driver
  • Worker 472 - Worker
  • Worker 473 - Worker

Load: 15.66 m³

Duration: 00:18:43

Travel Duration: 00:07:43

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:46

Slack: 22:11:13

Path info

Path ID: 195936

Truck: Truck auto 270 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 269 - Driver
  • Worker 536 - Worker
  • Worker 537 - Worker

Load: 16.0 m³

Duration: 00:18:30

Travel Duration: 00:07:30

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:33

Slack: 22:11:26

Path info

Path ID: 195937

Truck: Truck auto 306 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 305 - Driver
  • Worker 608 - Worker
  • Worker 609 - Worker

Load: 14.36 m³

Duration: 00:13:22

Travel Duration: 00:05:22

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:25

Slack: 22:16:34

Path info

Path ID: 195938

Truck: Truck auto 324 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 323 - Driver
  • Worker 644 - Worker
  • Worker 645 - Worker

Load: 15.81 m³

Duration: 00:19:14

Travel Duration: 00:08:14

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:17

Slack: 22:10:42

Path info

Path ID: 195939

Truck: Truck auto 392 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 391 - Driver
  • Worker 780 - Worker
  • Worker 781 - Worker

Load: 15.87 m³

Duration: 00:17:51

Travel Duration: 00:06:51

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:54

Slack: 22:12:05

Path info

Path ID: 195940

Truck: Truck auto 422 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 421 - Driver
  • Worker 840 - Worker
  • Worker 841 - Worker

Load: 15.83 m³

Duration: 00:17:07

Travel Duration: 00:06:07

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:10

Slack: 22:12:49

Path info

Path ID: 195941

Truck: Truck auto 478 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 477 - Driver
  • Worker 952 - Worker
  • Worker 953 - Worker

Load: 15.72 m³

Duration: 00:17:51

Travel Duration: 00:07:51

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:54

Slack: 22:12:05

Path info

Path ID: 195942

Truck: Truck auto 488 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 487 - Driver
  • Worker 972 - Worker
  • Worker 973 - Worker

Load: 15.34 m³

Duration: 00:16:05

Travel Duration: 00:07:05

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:08

Slack: 22:13:51

Path info

Path ID: 195943

Truck: Truck auto 522 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 521 - Driver
  • Worker 1040 - Worker
  • Worker 1041 - Worker

Load: 14.55 m³

Duration: 00:13:37

Travel Duration: 00:04:37

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:40

Slack: 22:16:19

Path info

Path ID: 195944

Truck: Truck auto 552 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 551 - Driver
  • Worker 1100 - Worker
  • Worker 1101 - Worker

Load: 15.75 m³

Duration: 00:15:55

Travel Duration: 00:06:55

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:58

Slack: 22:14:01

Path info

Path ID: 195945

Truck: Truck auto 568 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 567 - Driver
  • Worker 1132 - Worker
  • Worker 1133 - Worker

Load: 15.41 m³

Duration: 00:15:03

Travel Duration: 00:06:03

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:06

Slack: 22:14:53

Path info

Path ID: 195946

Truck: Truck auto 644 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 643 - Driver
  • Worker 1284 - Worker
  • Worker 1285 - Worker

Load: 15.5 m³

Duration: 00:18:01

Travel Duration: 00:07:01

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:04

Slack: 22:11:55

Path info

Path ID: 195947

Truck: Truck auto 678 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 677 - Driver
  • Worker 1352 - Worker
  • Worker 1353 - Worker

Load: 15.98 m³

Duration: 00:19:27

Travel Duration: 00:07:27

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:30

Slack: 22:10:29

Path info

Path ID: 195948

Truck: Truck auto 712 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 711 - Driver
  • Worker 1420 - Worker
  • Worker 1421 - Worker

Load: 12.73 m³

Duration: 00:11:06

Travel Duration: 00:04:06

Wait Duration: 00:00:00

Service Duration: 00:07:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:41:09

Slack: 22:18:50

Path info

Path ID: 195949

Truck: Truck auto 998 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 997 - Driver
  • Worker 1992 - Worker
  • Worker 1993 - Worker

Load: 15.77 m³

Duration: 00:17:50

Travel Duration: 00:07:50

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:53

Slack: 22:12:06

Path info

Path ID: 195950

Truck: Truck auto 8 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 7 - Driver
  • Worker 12 - Worker
  • Worker 13 - Worker

Load: 15.99 m³

Duration: 00:17:44

Travel Duration: 00:07:44

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:47

Slack: 22:12:12

Path info

Path ID: 195951

Truck: Truck auto 50 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 49 - Driver
  • Worker 96 - Worker
  • Worker 97 - Worker

Load: 15.92 m³

Duration: 00:17:31

Travel Duration: 00:07:31

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:34

Slack: 22:12:25

Path info

Path ID: 195952

Truck: Truck auto 80 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 79 - Driver
  • Worker 156 - Worker
  • Worker 157 - Worker

Load: 15.99 m³

Duration: 00:16:30

Travel Duration: 00:07:30

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:33

Slack: 22:13:26

Path info

Path ID: 195953

Truck: Truck auto 106 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 105 - Driver
  • Worker 208 - Worker
  • Worker 209 - Worker

Load: 15.04 m³

Duration: 00:16:20

Travel Duration: 00:06:20

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:23

Slack: 22:13:36

Path info

Path ID: 195954

Truck: Truck auto 128 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 127 - Driver
  • Worker 252 - Worker
  • Worker 253 - Worker

Load: 15.91 m³

Duration: 00:15:57

Travel Duration: 00:06:57

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:00

Slack: 22:13:59

Path info

Path ID: 195955

Truck: Truck auto 188 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 187 - Driver
  • Worker 372 - Worker
  • Worker 373 - Worker

Load: 15.76 m³

Duration: 00:16:54

Travel Duration: 00:06:54

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:57

Slack: 22:13:02

Path info

Path ID: 195956

Truck: Truck auto 196 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 195 - Driver
  • Worker 388 - Worker
  • Worker 389 - Worker

Load: 15.59 m³

Duration: 00:19:40

Travel Duration: 00:08:40

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:43

Slack: 22:10:16

Path info

Path ID: 195957

Truck: Truck auto 324 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 323 - Driver
  • Worker 644 - Worker
  • Worker 645 - Worker

Load: 15.74 m³

Duration: 00:17:02

Travel Duration: 00:07:02

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:05

Slack: 22:12:54

Path info

Path ID: 195958

Truck: Truck auto 348 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 347 - Driver
  • Worker 692 - Worker
  • Worker 693 - Worker

Load: 15.64 m³

Duration: 00:17:57

Travel Duration: 00:07:57

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:00

Slack: 22:11:59

Path info

Path ID: 195959

Truck: Truck auto 354 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 353 - Driver
  • Worker 704 - Worker
  • Worker 705 - Worker

Load: 14.45 m³

Duration: 00:15:13

Travel Duration: 00:06:13

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:16

Slack: 22:14:43

Path info

Path ID: 195960

Truck: Truck auto 408 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 407 - Driver
  • Worker 812 - Worker
  • Worker 813 - Worker

Load: 15.84 m³

Duration: 00:16:51

Travel Duration: 00:06:51

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:54

Slack: 22:13:05

Path info

Path ID: 195961

Truck: Truck auto 430 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 429 - Driver
  • Worker 856 - Worker
  • Worker 857 - Worker

Load: 15.62 m³

Duration: 00:16:30

Travel Duration: 00:06:30

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:33

Slack: 22:13:26

Path info

Path ID: 195962

Truck: Truck auto 438 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 437 - Driver
  • Worker 872 - Worker
  • Worker 873 - Worker

Load: 15.91 m³

Duration: 00:13:45

Travel Duration: 00:05:45

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:43:48

Slack: 22:16:11

Path info

Path ID: 195963

Truck: Truck auto 542 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 541 - Driver
  • Worker 1080 - Worker
  • Worker 1081 - Worker

Load: 14.43 m³

Duration: 00:17:08

Travel Duration: 00:08:08

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:11

Slack: 22:12:48

Path info

Path ID: 195964

Truck: Truck auto 600 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 599 - Driver
  • Worker 1196 - Worker
  • Worker 1197 - Worker

Load: 15.12 m³

Duration: 00:14:57

Travel Duration: 00:05:57

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:00

Slack: 22:14:59

Path info

Path ID: 195965

Truck: Truck auto 620 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 619 - Driver
  • Worker 1236 - Worker
  • Worker 1237 - Worker

Load: 14.01 m³

Duration: 00:14:39

Travel Duration: 00:05:39

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:42

Slack: 22:15:17

Path info

Path ID: 195966

Truck: Truck auto 650 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 649 - Driver
  • Worker 1296 - Worker
  • Worker 1297 - Worker

Load: 15.49 m³

Duration: 00:16:52

Travel Duration: 00:07:52

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:55

Slack: 22:13:04

Path info

Path ID: 195967

Truck: Truck auto 704 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 703 - Driver
  • Worker 1404 - Worker
  • Worker 1405 - Worker

Load: 15.9 m³

Duration: 00:17:06

Travel Duration: 00:07:06

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:09

Slack: 22:12:50

Path info

Path ID: 195968

Truck: Truck auto 706 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 705 - Driver
  • Worker 1408 - Worker
  • Worker 1409 - Worker

Load: 15.69 m³

Duration: 00:14:44

Travel Duration: 00:06:44

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:47

Slack: 22:15:12

Path info

Path ID: 195969

Truck: Truck auto 714 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 713 - Driver
  • Worker 1424 - Worker
  • Worker 1425 - Worker

Load: 15.33 m³

Duration: 00:16:51

Travel Duration: 00:07:51

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:54

Slack: 22:13:05

Path info

Path ID: 195970

Truck: Truck auto 742 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 741 - Driver
  • Worker 1480 - Worker
  • Worker 1481 - Worker

Load: 15.83 m³

Duration: 00:18:34

Travel Duration: 00:07:34

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:37

Slack: 22:11:22

Path info

Path ID: 195971

Truck: Truck auto 808 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 807 - Driver
  • Worker 1612 - Worker
  • Worker 1613 - Worker

Load: 15.67 m³

Duration: 00:17:42

Travel Duration: 00:07:42

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:45

Slack: 22:12:14

Path info

Path ID: 195972

Truck: Truck auto 842 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 841 - Driver
  • Worker 1680 - Worker
  • Worker 1681 - Worker

Load: 15.21 m³

Duration: 00:17:05

Travel Duration: 00:07:05

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:08

Slack: 22:12:51

Path info

Path ID: 195973

Truck: Truck auto 858 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 857 - Driver
  • Worker 1712 - Worker
  • Worker 1713 - Worker

Load: 15.9 m³

Duration: 00:16:32

Travel Duration: 00:06:32

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:35

Slack: 22:13:24

Path info

Path ID: 195974

Truck: Truck auto 888 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 887 - Driver
  • Worker 1772 - Worker
  • Worker 1773 - Worker

Load: 15.69 m³

Duration: 00:17:58

Travel Duration: 00:07:58

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:01

Slack: 22:11:58

Path info

Path ID: 195975

Truck: Truck auto 968 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 967 - Driver
  • Worker 1932 - Worker
  • Worker 1933 - Worker

Load: 15.92 m³

Duration: 00:15:04

Travel Duration: 00:06:04

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:07

Slack: 22:14:52

Path info

Path ID: 195976

Truck: Truck 4 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • person9 - Driver
  • person8 - Worker
  • person11 - Worker

Load: 15.81 m³

Duration: 00:18:11

Travel Duration: 00:07:11

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:14

Slack: 22:11:45

Path info

Path ID: 195977

Truck: Truck auto 13 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 12 - Driver
  • Worker 22 - Worker
  • Worker 23 - Worker

Load: 15.66 m³

Duration: 00:14:21

Travel Duration: 00:05:21

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:24

Slack: 22:15:35

Path info

Path ID: 195978

Truck: Truck auto 33 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 32 - Driver
  • Worker 62 - Worker
  • Worker 63 - Worker

Load: 15.41 m³

Duration: 00:16:48

Travel Duration: 00:07:48

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:51

Slack: 22:13:08

Path info

Path ID: 195979

Truck: Truck auto 39 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 38 - Driver
  • Worker 74 - Worker
  • Worker 75 - Worker

Load: 14.98 m³

Duration: 00:18:15

Travel Duration: 00:08:15

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:18

Slack: 22:11:41

Path info

Path ID: 195980

Truck: Truck auto 41 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 40 - Driver
  • Worker 78 - Worker
  • Worker 79 - Worker

Load: 15.19 m³

Duration: 00:17:34

Travel Duration: 00:07:34

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:37

Slack: 22:12:22

Path info

Path ID: 195981

Truck: Truck auto 65 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 64 - Driver
  • Worker 126 - Worker
  • Worker 127 - Worker

Load: 15.01 m³

Duration: 00:18:32

Travel Duration: 00:07:32

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:35

Slack: 22:11:24

Path info

Path ID: 195982

Truck: Truck auto 95 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 94 - Driver
  • Worker 186 - Worker
  • Worker 187 - Worker

Load: 15.5 m³

Duration: 00:14:51

Travel Duration: 00:05:51

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:54

Slack: 22:15:05

Path info

Path ID: 195983

Truck: Truck auto 105 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 104 - Driver
  • Worker 206 - Worker
  • Worker 207 - Worker

Load: 15.77 m³

Duration: 00:16:41

Travel Duration: 00:07:41

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:44

Slack: 22:13:15

Path info

Path ID: 195984

Truck: Truck auto 121 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 120 - Driver
  • Worker 238 - Worker
  • Worker 239 - Worker

Load: 15.45 m³

Duration: 00:16:35

Travel Duration: 00:06:35

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:38

Slack: 22:13:21

Path info

Path ID: 195985

Truck: Truck auto 135 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 134 - Driver
  • Worker 266 - Worker
  • Worker 267 - Worker

Load: 15.91 m³

Duration: 00:17:03

Travel Duration: 00:07:03

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:06

Slack: 22:12:53

Path info

Path ID: 195986

Truck: Truck auto 193 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 192 - Driver
  • Worker 382 - Worker
  • Worker 383 - Worker

Load: 15.93 m³

Duration: 00:19:59

Travel Duration: 00:08:59

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:50:02

Slack: 22:09:57

Path info

Path ID: 195987

Truck: Truck auto 215 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 214 - Driver
  • Worker 426 - Worker
  • Worker 427 - Worker

Load: 15.86 m³

Duration: 00:16:48

Travel Duration: 00:06:48

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:51

Slack: 22:13:08

Path info

Path ID: 195988

Truck: Truck auto 313 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 312 - Driver
  • Worker 622 - Worker
  • Worker 623 - Worker

Load: 15.02 m³

Duration: 00:17:54

Travel Duration: 00:06:54

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:57

Slack: 22:12:02

Path info

Path ID: 195989

Truck: Truck auto 373 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 372 - Driver
  • Worker 742 - Worker
  • Worker 743 - Worker

Load: 14.64 m³

Duration: 00:16:18

Travel Duration: 00:06:18

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:21

Slack: 22:13:38

Path info

Path ID: 195990

Truck: Truck auto 503 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 502 - Driver
  • Worker 1002 - Worker
  • Worker 1003 - Worker

Load: 14.91 m³

Duration: 00:17:22

Travel Duration: 00:07:22

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:25

Slack: 22:12:34

Path info

Path ID: 195991

Truck: Truck auto 529 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 528 - Driver
  • Worker 1054 - Worker
  • Worker 1055 - Worker

Load: 15.9 m³

Duration: 00:16:13

Travel Duration: 00:06:13

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:16

Slack: 22:13:43

Path info

Path ID: 195992

Truck: Truck auto 557 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 556 - Driver
  • Worker 1110 - Worker
  • Worker 1111 - Worker

Load: 15.73 m³

Duration: 00:18:05

Travel Duration: 00:08:05

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:08

Slack: 22:11:51

Path info

Path ID: 195993

Truck: Truck auto 561 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 560 - Driver
  • Worker 1118 - Worker
  • Worker 1119 - Worker

Load: 15.86 m³

Duration: 00:17:04

Travel Duration: 00:07:04

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:07

Slack: 22:12:52

Path info

Path ID: 195994

Truck: Truck auto 607 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 606 - Driver
  • Worker 1210 - Worker
  • Worker 1211 - Worker

Load: 15.98 m³

Duration: 00:19:20

Travel Duration: 00:08:20

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:23

Slack: 22:10:36

Path info

Path ID: 195995

Truck: Truck auto 617 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 616 - Driver
  • Worker 1230 - Worker
  • Worker 1231 - Worker

Load: 13.52 m³

Duration: 00:14:30

Travel Duration: 00:06:30

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:44:33

Slack: 22:15:26

Path info

Path ID: 195996

Truck: Truck auto 639 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 638 - Driver
  • Worker 1274 - Worker
  • Worker 1275 - Worker

Load: 14.72 m³

Duration: 00:16:11

Travel Duration: 00:07:11

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:14

Slack: 22:13:45

Path info

Path ID: 195997

Truck: Truck auto 695 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 694 - Driver
  • Worker 1386 - Worker
  • Worker 1387 - Worker

Load: 15.34 m³

Duration: 00:16:31

Travel Duration: 00:06:31

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:34

Slack: 22:13:25

Path info

Path ID: 195998

Truck: Truck auto 705 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 704 - Driver
  • Worker 1406 - Worker
  • Worker 1407 - Worker

Load: 15.71 m³

Duration: 00:16:01

Travel Duration: 00:07:01

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:04

Slack: 22:13:55

Path info

Path ID: 195999

Truck: Truck auto 827 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 826 - Driver
  • Worker 1650 - Worker
  • Worker 1651 - Worker

Load: 15.59 m³

Duration: 00:17:51

Travel Duration: 00:07:51

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:54

Slack: 22:12:05

Path info

Path ID: 196000

Truck: Truck auto 919 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 918 - Driver
  • Worker 1834 - Worker
  • Worker 1835 - Worker

Load: 13.76 m³

Duration: 00:15:43

Travel Duration: 00:06:43

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:46

Slack: 22:14:13

Path info

Path ID: 196001

Truck: Truck auto 42 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 41 - Driver
  • Worker 80 - Worker
  • Worker 81 - Worker

Load: 15.22 m³

Duration: 00:15:33

Travel Duration: 00:06:33

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:36

Slack: 22:14:23

Path info

Path ID: 196002

Truck: Truck auto 52 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 51 - Driver
  • Worker 100 - Worker
  • Worker 101 - Worker

Load: 15.66 m³

Duration: 00:15:54

Travel Duration: 00:06:54

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:57

Slack: 22:14:02

Path info

Path ID: 196003

Truck: Truck auto 140 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 139 - Driver
  • Worker 276 - Worker
  • Worker 277 - Worker

Load: 15.85 m³

Duration: 00:17:44

Travel Duration: 00:08:44

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:47

Slack: 22:12:12

Path info

Path ID: 196004

Truck: Truck auto 148 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 147 - Driver
  • Worker 292 - Worker
  • Worker 293 - Worker

Load: 15.91 m³

Duration: 00:20:32

Travel Duration: 00:09:32

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:50:35

Slack: 22:09:24

Path info

Path ID: 196005

Truck: Truck auto 158 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 157 - Driver
  • Worker 312 - Worker
  • Worker 313 - Worker

Load: 15.71 m³

Duration: 00:16:57

Travel Duration: 00:06:57

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:00

Slack: 22:12:59

Path info

Path ID: 196006

Truck: Truck auto 168 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 167 - Driver
  • Worker 332 - Worker
  • Worker 333 - Worker

Load: 14.36 m³

Duration: 00:16:43

Travel Duration: 00:07:43

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:46

Slack: 22:13:13

Path info

Path ID: 196007

Truck: Truck auto 218 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 217 - Driver
  • Worker 432 - Worker
  • Worker 433 - Worker

Load: 15.73 m³

Duration: 00:19:23

Travel Duration: 00:09:23

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:26

Slack: 22:10:33

Path info

Path ID: 196008

Truck: Truck auto 370 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 369 - Driver
  • Worker 736 - Worker
  • Worker 737 - Worker

Load: 15.96 m³

Duration: 00:18:46

Travel Duration: 00:08:46

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:49

Slack: 22:11:10

Path info

Path ID: 196009

Truck: Truck auto 412 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 411 - Driver
  • Worker 820 - Worker
  • Worker 821 - Worker

Load: 15.34 m³

Duration: 00:18:44

Travel Duration: 00:08:44

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:48:47

Slack: 22:11:12

Path info

Path ID: 196010

Truck: Truck auto 448 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 447 - Driver
  • Worker 892 - Worker
  • Worker 893 - Worker

Load: 15.69 m³

Duration: 00:20:11

Travel Duration: 00:08:11

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:50:14

Slack: 22:09:45

Path info

Path ID: 196011

Truck: Truck auto 532 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 531 - Driver
  • Worker 1060 - Worker
  • Worker 1061 - Worker

Load: 15.91 m³

Duration: 00:16:24

Travel Duration: 00:06:24

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:27

Slack: 22:13:32

Path info

Path ID: 196012

Truck: Truck auto 668 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 667 - Driver
  • Worker 1332 - Worker
  • Worker 1333 - Worker

Load: 15.55 m³

Duration: 00:14:57

Travel Duration: 00:05:57

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:00

Slack: 22:14:59

Path info

Path ID: 196013

Truck: Truck auto 692 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 691 - Driver
  • Worker 1380 - Worker
  • Worker 1381 - Worker

Load: 15.9 m³

Duration: 00:19:37

Travel Duration: 00:09:37

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:40

Slack: 22:10:19

Path info

Path ID: 196014

Truck: Truck auto 742 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 741 - Driver
  • Worker 1480 - Worker
  • Worker 1481 - Worker

Load: 15.98 m³

Duration: 00:19:03

Travel Duration: 00:09:03

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:06

Slack: 22:10:53

Path info

Path ID: 196015

Truck: Truck auto 748 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-07

Personnel:

  • Driver 747 - Driver
  • Worker 1492 - Worker
  • Worker 1493 - Worker

Load: 15.42 m³

Duration: 00:15:11

Travel Duration: 00:06:11

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:14

Slack: 22:14:45

Path info

Path ID: 196016

Truck: Truck auto 7 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 6 - Driver
  • Worker 10 - Worker
  • Worker 11 - Worker

Load: 15.64 m³

Duration: 00:20:31

Travel Duration: 00:09:31

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:50:34

Slack: 22:09:25

Path info

Path ID: 196017

Truck: Truck auto 29 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 28 - Driver
  • Worker 54 - Worker
  • Worker 55 - Worker

Load: 15.78 m³

Duration: 00:21:49

Travel Duration: 00:09:49

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:51:52

Slack: 22:08:07

Path info

Path ID: 196018

Truck: Truck auto 101 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 100 - Driver
  • Worker 198 - Worker
  • Worker 199 - Worker

Load: 16.0 m³

Duration: 00:17:11

Travel Duration: 00:08:11

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:14

Slack: 22:12:45

Path info

Path ID: 196019

Truck: Truck auto 103 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 102 - Driver
  • Worker 202 - Worker
  • Worker 203 - Worker

Load: 15.65 m³

Duration: 00:17:31

Travel Duration: 00:08:31

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:34

Slack: 22:12:25

Path info

Path ID: 196020

Truck: Truck auto 113 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 112 - Driver
  • Worker 222 - Worker
  • Worker 223 - Worker

Load: 15.98 m³

Duration: 00:17:03

Travel Duration: 00:08:03

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:06

Slack: 22:12:53

Path info

Path ID: 196021

Truck: Truck auto 181 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 180 - Driver
  • Worker 358 - Worker
  • Worker 359 - Worker

Load: 15.38 m³

Duration: 00:16:26

Travel Duration: 00:06:26

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:29

Slack: 22:13:30

Path info

Path ID: 196022

Truck: Truck auto 187 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 186 - Driver
  • Worker 370 - Worker
  • Worker 371 - Worker

Load: 15.42 m³

Duration: 00:15:31

Travel Duration: 00:06:31

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:34

Slack: 22:14:25

Path info

Path ID: 196023

Truck: Truck auto 253 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 252 - Driver
  • Worker 502 - Worker
  • Worker 503 - Worker

Load: 15.35 m³

Duration: 00:20:04

Travel Duration: 00:09:04

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:50:07

Slack: 22:09:52

Path info

Path ID: 196024

Truck: Truck auto 263 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 262 - Driver
  • Worker 522 - Worker
  • Worker 523 - Worker

Load: 15.45 m³

Duration: 00:16:59

Travel Duration: 00:07:59

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:02

Slack: 22:12:57

Path info

Path ID: 196025

Truck: Truck auto 397 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 396 - Driver
  • Worker 790 - Worker
  • Worker 791 - Worker

Load: 15.8 m³

Duration: 00:17:13

Travel Duration: 00:07:13

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:47:16

Slack: 22:12:43

Path info

Path ID: 196026

Truck: Truck auto 511 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 510 - Driver
  • Worker 1018 - Worker
  • Worker 1019 - Worker

Load: 15.18 m³

Duration: 00:15:06

Travel Duration: 00:06:06

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:09

Slack: 22:14:50

Path info

Path ID: 196027

Truck: Truck auto 557 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 556 - Driver
  • Worker 1110 - Worker
  • Worker 1111 - Worker

Load: 15.57 m³

Duration: 00:19:12

Travel Duration: 00:09:12

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:15

Slack: 22:10:44

Path info

Path ID: 196028

Truck: Truck auto 691 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 690 - Driver
  • Worker 1378 - Worker
  • Worker 1379 - Worker

Load: 15.57 m³

Duration: 00:19:22

Travel Duration: 00:09:22

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:49:25

Slack: 22:10:34

Path info

Path ID: 196029

Truck: Truck auto 899 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 898 - Driver
  • Worker 1794 - Worker
  • Worker 1795 - Worker

Load: 15.72 m³

Duration: 00:16:13

Travel Duration: 00:06:13

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:46:16

Slack: 22:13:43

Path info

Path ID: 196030

Truck: Truck auto 915 - 16.0m³ - GENERAL

Date: 2025-12-07

Personnel:

  • Driver 914 - Driver
  • Worker 1826 - Worker
  • Worker 1827 - Worker

Load: 15.19 m³

Duration: 00:15:38

Travel Duration: 00:06:38

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:03

End Time: 01:45:41

Slack: 22:14:18